Design, Construction, Supply, Installation, Testing And Commissioning Of 3.8 Mld Raw Sewage Pumping Station And 3 Mld Sewage Treatment Plant Based On Sbr Technology Followed By Operation And Maintenance For 3 Year At Sanquelim, Goa
Rehabilitation Of Nme Pipe Sewers By Trench. Techn. Using Inline Replace. Of Existing Sewers Of Vasco Sew. Sys. With Hdpe Pipe By Pipe Burst. Method In Vasco Rail. St, Court Rd, Munc. Rd, Fl Gomes Rd, Saifulla
Notice Inviting Expression Of Interest For Empanelment Of Consultants Including Project Management Consultants In The Field Of Sewerage Infrastructural Projects.
Upgradation Of Exist. Sewage P.s. No Ps1, Ps2, Ps3, Ps11 And Ktc By Provid., Supply, Installation, Testing, Commissioning Of Scada Syst. Includ.scada Control Panel, Central Monitor.facility And Supply Of Centrifugal Pumps
Const. Of P.s. Including Mechanical And Electrical Works Along With Rising Main, Sewer Gravity Line And Manholes Leftout Areas Near Pontemol, Hanuman Mandir And Mathimol Curchorem Constituency In Quepem Taluka.
Provid., T. Comm. Of Sewer Line By H D D Method Const. Of Gravity Sewer Lines Const. Of Manholes And Reinst. Of Rd Bal. Wrk At Mathimol, Vodlemol And Surr. Ar In Curch. Const. Of Quepem Taluka
Reinstatement And Restoration Of Damaged Road Stretches Due To Ongoing Works For Sewerage Scheme For Colva And Its Surrounding Areas Zone I Phase Iii At Colva Before Annual Fama In Benaulim Constituency Reinstatement And Restoration Of Damaged Road Stretches Due To Ongoing Works For Sewerage Scheme For Colva And Its Surrounding Areas Zone I Phase Iii At Colva Before Annual Fama In Benaulim Constituency.
Rehabilitation Of Nme Pipe Sewers By Trench. Techn. Using Inline Replac. Of Existing Sewers Of Vasco Sew Sys With Hdpe Pipe By Pipe Bursting Method In Driver Hill Rd And Areas Of Ward 16 And Surr.ar
Providing, Laying, Testing And Commississioning Of Sewerage Network Including Construction Of Manhole, Providing House Sewer Connection And Reinstament Of Road At Green Circle Area In Reismagos Village Panchayat Of Saligao Constituency.
Revamping Of 7.5 Mld Activated Sludge Process Stp To 20 Mld Stp Based On Sbr Technology Followed By Operation And Maintenance For 2 Year At Shirvodem