Proposed New Bg Line Connecting Nagapattinam And Tiruthuraipundi Via Tirukkuvalai. I Earthwork In Forming Bank Duly Providing And Installation Of Band Drain, Conventional Track Blanketing, Supply And Spreading Of 6mm Stone Metal Chips In Forming Bank And Construction Of Retaining Wall Between Ch: 3000 To Ch: 13000 & Ch: 21600 To Ch:23100 Ii Construction Of Limited Use Subway At Ch:7000 Iii Proposed Construction Of Major Bridges Balance Works Part Substructure And Complete Super Structure Across Rivers Kaduvaiyar 5 X 12.20m Psc I Girder At Ch: 9538.00 Pandavaiyar 3 X 12.20m Psc U Girder At Ch:16424.00 And Vellaiyar 4 X 12.20m Psc U Girder At Ch:17545. Two Packet System
For more details Kindly fill up the form and our executive will get in touch with you or Call us :- 916351913337 .