Arresting Roof Leakage And Re Arrangement Of Aluminium Partitioning Work And Modification To Toilet For Meeting Hall At Csc Building Manjeri-2nd Call
Certain Repairs To Joinery, Aluminium Partitioning And Other Allied Works In Zone-ii, Iii, Iv, V, Vi, Vii, Viii And Rtrs At Tbrl Range Ramgarh Ge I R And D/chd-35/2025-26
Arresting Roof Leakage And Re Arrangement Of Aluminium Partitioning Work And Modification To Toilet For Meeting Hall At Csc Building Manjeri
Gem Bids For Aluminium Partitioning In Nsc Section For Ojt Trg Of Technicians Tech Computer
Aluminium Partitioning, Glass Film And Electrical Work In Room No. C215 And C216 In Sab Building At Iit Ropar Sh Civil And Electrical
Certain Repairs To Joinery, Ceiling, Aluminium Partitioning And Other Allied Works In Zone-i, Etf, Aag And Domestic Area At Tbrl Range Ramgarh Ge I R And D/chd-22/2025-2026
Certain Repairs To Joinery, Aluminium Partitioning And Other Allied Works In Zone-ii, Iii, Iv, V, Vi, Vii, Viii And Rtrs At Tbrl Range Ramgarh Ge I R And D/chd-35/2025-26
Dismantling Of Existing Damaged Walls, R C C Flooring Works And Aluminium Partitioning Works Cutn
Certain Repairs To Joinery, Ceiling, Aluminium Partitioning And Other Allied Works In Zone-i, Etf, Aag And Domestic Area At Tbrl Range Ramgarh Ge I R And D/chd-22/2025-26
Upgradation Of Ship Support Complex Washing And Drinking Point Area At Hqnavc Minimum Average Annual Turnover Of The Years Of Past Experience Required For Mse Exemption For Years Of Startup Exemption For Years Of Experience Criteria Past Performance Bidder Turnover Certificate Requested In Atc Compliance Of Boq *In Case Any Bidder Is Seeking Exemption From Experience / Turnover Criteria The Supporting Documents To Prove His Eligibility For Exemption Must Be Uploaded For Evaluation By The Buyer Do You Want To Show Documents Uploaded By Bidders To All Bidders Participated In No Bid/ Primary Product Category Upgradation Of Walls By Customized Decorative Artisticacrylic Coatings Time Allowed For Technical Clarifications Inspection Required By Empanelled Inspection Authority / Agencies Pre- No Registered With Gem Arbitration Clause No Mediation Clause No, 3269 Upgradation Of Walls By Customized Decorative Artistic Acrylic Coatings Rerouting And Concealing Of Drinking Water And Washing Area Water Pipe Lines Pipe Lines Material And Labour For Cantilever Platform For Filling Of Water Using Sold Base And Top Material And Labour For Ms Fabrication Work For Extension Of Customized Top Roof With Steel Pipe And Angle Frames Supply And Fixing Of Corrugated Galvalume Sheet For Ridge And Eaves Gutter Supply And Fixing Of Plain Galvalume Sheet For Roof Ridge And Eaves Gutter Provision Of Rain Water Drain Aluminium Partitioning Of Door And Sliding Window Using Powder Coated Sections Material And Labour For Vox Panelling For Ceiling Provision Of Decorative Modular Light Fittings With Renewal Of Internal Cables Etc Supply And Fixing Of Stainless Steel Sink Material And Labour For Customized Cabinet Door Wash Basin Area Customised Shelf Cabinet