Supply Of Spares For Stage I And Ii Bottom Ash Hopper Ash Disposal System
Rectification Works To The Air Duct Pedestals In Between Bottom Ash Hopper And Mill Bay In Unit 4 Area
Rectification Works To The Air Duct Pedestals In Between Bottom Ash Hopper And Mill Bay In Unit 5 Area
Supply Of Eco Hopper Spill Over Ash Disposal Tray For Middle Path Of Unit Iii Eco Hoppers
Cleaning Clearing And Transporting The Spilled Ash From Duct Hopper A Side Floor Area To Upper Ash Dyke By Using Contractors Vehicle And Unloading The Same And Return Ot 192 Duct Hopper A
Procurement Of Insulating Gate And Jaw Crusher Plate Assembly Including Linear Actuator For Drycon System Of Bottom Ash Hopper 1 Set
Work Of Removal Of Old Damaged Refractory, Application Of The New Castable Refractory/ Fire Brick Lining In Bottom Ash Hopper & Fabrication Work In Unit 3, 4 & 5 At Ukai Tps During Aoh, Coh, Rsd Or As & When Required Basis.Wt-5019 Ahp-2
Repair And Maintenance Works To The Ash Slurry Drainage Side Wall From Ash Slurry Sump Stage 1 To Bottom Ash Hopper Of Unit 2
Repair And Maintenance Works To The Ash Slurry Drainage Side Wall From Ash Slurry Sump Stage 2 To Bottom Ash Hopper Of Unit 3
Procurement Of Various Spares For Bottom Ash Hopper In Ash Handling Plant 2x600mw Unit 1 And 2 Sstpp Mppgcl Dongalia