Tggenco Btps Stage Ii Cam Division Reconditioning Of Clinker Grinder Rollers Roller Shafts Shaft Sleeves Fabrication Of Wear And Guide Plates And Shaft Sleeve Housings Of Unit 3 Bottom Ash Hopper Clinker Grinder Assemblies During The Overhaul For The Year 2025-26
Supply Of Double Acting Pneumatic Cylinder Assembly And Its Spares For Bottom Ash Hopper In Wet Ash Handling System, Ktps-vi Stage
Supply Of Fluid Coupling Assembly And Its Spare Parts For Clinker Grinders At Bottom Ash Hopper In Wet Ash Handling System In Ktps -vi Stage
Supply Of Frame Seals For Feed Gates Of Bottom Ash Hopper In Ash Handling System And 100% Neoprene Rubber Gasket For Buffer Hoppers, In Cam Division - Ktps-vi Stage
Supply Of Clinker Grinder Spares For Bottom Ash Hopper In Wet Ash Handling System, Ktps-vi Stage
Work Of Complete Replacement Seal Plate And Seal Trough Bowl In Bottom Ash Hopper And Fabrication, Erection And Strengthening Of Ba Hopper Plate And Structure Also Providing And Applying Of 2 Coat Of Epoxy Paint In Unit 3 To 5 During R And M At Gsecl Ukai Tps. Wt-5037 Ahp-2.
Procurement Of Oscillating Screen Pan Assembly For Drycon System Of Bottom Ash Hopper 1 No
Providing Additional Hydraulic Power Pack System For Bottom Ash Hopper No 2 Including Supply Of Required Materials
Repairing/replacement Of Plates And Refractory Work Of Bottom Ash Hopper And Other Works Like As Changing Of Roller, Rail Guide Of Feed Gate System Of Bah During Overhauling Of Unit 4, 2x210 Mw, Btps, Parichha
Work Of Complete Overhauling Of Bottom Ash Hopper And Its Connected Parts Such As Seal Trough, Seal Plate, Flushing Nozzle, Drip Shield, Refractory Cooling Pipes Etc. On As And When Required And Aoh-coh In Ash Plant Unit 3 To 5 At Ukai Tps. Wt-5018 Ahp-2.