Repair And Retrofitting Work Of High Level Bridge In 16th Km Of Dantu Kathara Road At Damodar River Under Road Division For The Year 2025-26
Urgent Road Repair Works Along The Habitations From Km 106.590 To Km 108.553 On Nh 04 In The Ut Of Andaman And Nicobar Islands At The Risk Cost Of Existing Epc Contractor Of Balance Work Of Middle Strait Bridge On Item Rate Basis Through Open Tender Nhidcl/Ro/A N/R C/Mscb/Fy 2025 26/03
Work For Tile Work Bridge To Mandir Nachlana Old Market Wno 1
Construction Of High Level Bridge At Km 20/10 Of Kadambur - Puliyampatti - Deivaseyalpuram Road In Lieu Of Existing Causeway. Bridge Work
Pipe Execution Work From Dungipada Railway Bridge To New Railway Staff Quarter
A Akyn - Kjt:-Replacement Of Old Stone Top/Rail Top Bridges 59/3, 60/1, 63/3, 63/6, 64/1, 64/2, 65/2, 65/3, 65/3A, 66/3, 66/5 By Rcc Box/Pipe To Match Bridge Configuration With Mrvc New Bridge Work Of 3Rd & 4Th Line In Kyn-Kjt Section. Bclosure Of Existing Old Bridges 58/2, 62/4, 63/4, 66/2, 66/5, 67/1, 67/5 After Construction Of Bridges By Mrvc In Kyn-Kjt Section Under Aden/T/Kyn Section. Baugmentation Of 83/2, 86/3, 88/6, 90/3 Water Way Bridges By Replacing Small Stone Top Bridges To Avoid Flooding In Kyn-Kjt Section. Project Id No. 01.02.32.24.3.51.010 C A Kyn-Kjt:- Rehabilitation Of Arch Bridges By Jacketing Of Br. No. 65/2, 69/5, 72/4, 73/1 And 74/2. B Protection Of Embankment Of Br. No. 70/3 Raw To Barrage By Provision Of Retaining Wall/ Gabion On Both Up And Dn Side. D Kalyan- Karjat :- Jacketing And Increasing Barrel Length Of Br. No.51/3, 52/4, 75/1, 76/1, 77, 1, 77/2, 78/1 In Kyn -Kjt Section Under Aden T Kyn.
Restoration Of Rain Damages On Badukhar Riyali Bela Ludhaircha Road Km 0.0 To 4.500 Sh Providing And Laying Wire Crate With Apron For Protection Work Riyali Bridge At Rd 0.920 Upstream Side.
Balance Work Rebuilding Of Bridge No.35, Rcc Box Segmental Of Span 1X3.66M At Km 21/8-9, Br.No.35A, Rcc Box Segmental Of Span 1X 3.66M At Km 22/4-5 Between Narangi-Panikhati And Rebuilding Of Bridge No.43, Rcc Box Segmental Of Span 1X3.66M At Km 32/9-33/0 Thakurkuchi-Panbari.
Urgent Road Repair Works Along The Habitations From Km 106.590 To Km 108.553 On Nh 04 In The Ut Of A And N Islands At The Risk And Cost Of Existing Epc Contractor Of Balance Work Of Middle Strait Bridge, On Item Rate Basis
Execution Of Earthwork In Formation, Construction Of Major Bridgesuperstructure, Minor Bridge, P-way Work, Supply Of Ballast And Other Allied Miscellaneous Works Between Rajnandgaon-parinala In Connection With Construction Of 4th Line Between Durg-rajnandgaon 31.00km