Construction Organization: Secunderabad Division: Sanathnagar-moula Ali Bye- Pass Line Section. Proposed Construction Of "road Under Bridge" (br.no.44-a) Proposed Span As 2x9.00x5.00 M (min.5.0m Clear Ht) Rcc Boxes At Km. 15/1-2 In Lieu Of Existing Level Crossing No. Bp-8 Special Class (m) At Km.15/2-3 Between Ammuguda - Moula Ali Stations For Four Lane Carriage Way For Bridge Proper In Civil Engineering Portion.
Refer To Boq Const. And Maintenance Of Road L023-link Road Kanidajan Nowgam Road Km 5th Rd 450 To Balador Via Kawkoot, New, Complete, New Technology Waste Plastic, Pkg No Jk02-4016, Length 2.551 Km, Carriage Way Width- 3.75m, Block Nagam, Piu Budgam - 2nd Call
Const. And Maint Of Road L051-link Road Bl Road Km 28th Rd 950m To Jatpati Awoora, New Tech Waste Plastic, Complete, Pkg No Jk01-4001, Length 2.60 Km, Carriage Way Width- 3.75m Under Pmgsy Iv, Batch I, Fy 2025-26, Pahalgam, Piu Anantnag - 2nd Call
Improvements To Tadvai - Narlapur Road From Km 12/4 To 15/6 Bustand To Stupam In Medaram Village With Four Lane In Mulugu District B Widening And Strengthening Of Existing Double Lane Road To 10 M Carriage Way From Km 15/4 To 18/0 Of Pasra Bhupalpally Road Km 18/6-19/9 Of Tadvai Narlapur Road
Refer To Boq Const. And Maintenance Of Road L022-Chechmulla Aherbal Road Km 8Th Rd 400 To Pahlipora, New, Stage Complete, Pkg No Jk18-4016, Length 1.80 Km, Carriage Way Width- 3.75M Under Pmgsy Iv, Batch I, Fy 2025-26, Block - Manzgam, Division Kulgam - 2Nd Call
Recarpeting Of Main And Carriage Way From Jn17 To Jn43 Both Sides Except Jn 18 To Jn 19 Ut Chandigarh
Repairing Of Roadpatch Work Of 60 Mtr Outer Road Lhs Sideonly One Side Carriage Way Of Central Verage From Plot No. Cp -04 To Plot No.624 At Various Locations Sector 08, Imt Manesar
Widening Of Main Carriage Way And Construction And Repairing Of Service Road At Dsc Road And Construction Of Rcc Drain Along Service Road From Hindon River To Kacchi Sadak
Construction And Maintenance Of Road L026-l040 Seerpora Km 1st Rd 450 To Hajampora, New, Stage Complete, Pkg No Jk18-4027, Length 2.20 Km, Carriage Way Width- 3.75m Pmgsy Iv, Batch I, F.y 2025-26, Block - D.h Pora
Repairing Work Of Carriage Way Of Gt Road At Chainage 659.00kmp To 661.00kmp With Potholes Repairing, Open Graded Premix Surface Patches And Premixed Seal Coat Type-b Under Serampore Sub Division, Pwd Of Hooghly Division During The Year 2025-2026 Wbpwd/ae/ser/nit 20/2025 2026