Setting-Up Of Quick Coach Watering Arrangement Between Road No. 1 & 2 And Road No. 3 & 4 At Hrr Sw-I:- Oht To Pump House Sw-Ii:- Pump House To Hydrant Sw-Iii:- Hrr- Quick Coach Watering Arrangement For 24 Coach Length Between Road 1 -2 As Per Camtech Recommendations Sw-Iv:- Hrr- Quick Coach Watering Arrangement For 24 Coach Length Between Road 3 & 4 As Per Camtech Recommendations Sw-V:- Dismantling Of Existing Conventional Coach Watering Pipe Line Arrangement Between Road 1 & 2. Sw-Vi:- Construction Of Pathway 1 Wide Between Road 1 & 2 And 3 &4 600 Meter Length Each. Sw-Vii:- Construction Of Side Drain 300 Mtrs Length At Road 1& 2 And 600 Mtrs Length At Road 3 & 4. Sw- Viii:- Hrr- Construction Of Pump House. Sw-Ix:- Hrr- Construction Of Glr 2.5 Lakh Liters Capacity Sw-X:- Hrr- Construction Of Over Head Tank 2.5 Lakh Liters Capacity
Bza Division: Repair/Replacement Of Defective Equipment/Items At Camtech Booster Pump House Of Coach Watering Arrangement At Vijayawada Station.
Provision Of Power Supply Arrangements For The Newly Manned Lc Gates No. 122 Between Bgpa - Hht, Lc No. 134 Between Bntl - Padl, Lc No. 136 Between Srf - Tlgp And Lc No. 121 Between Anf - Srf Total 4 Nos. Over Mys Div. 2 Has-Majn Section - Elimination Of Lc No. 59 At Km 103/300-400 And Lc No. 62 At Km 104/300-400 Between Sbhr - Ydm Stations By Construction Of Low Cost Robs. 3 Has-Majn Section - Elimination Of Lc No. 97 At Km 131/400-500 And Lc No. 101 At Km 134/200-300 Between Nrj - Kbpr Stations By Construction Of Low Cost Robs. 4 Upgradation Of Existing Coach Watering Arrangement To Quick Coach Watering System In Platform No. 1
Electrical Work In Connection With Improvement To Quick Coach Watering Arrangement On Platform 1 To 7 At Railway Station Bathinda On Camtech Pattern And Improvement Of Water Supply At Chandigarh By Providing Deep Tubewell In Lieu Of Pump No 5 & 6 And Oh Storage Tank In Lieu Of Corroded Ms Tank No.4 And Replacement Of Damaged Pipe Line And Interlinking Of New Bore Holes With New Rcc Oh Tank And Old Rcc Oh Tank In The Section Of Sse/W/1/Cdg Over
Improvement To Quick Coach Watering Arrangement On Platform No 1 To 7 At Railway Station On Camtech Pattern Under Aden/Bti.
Provision Of Rcc Over Head Tank In C/W Quick Coach Watering Arrangement On Platform No. 1 To 6 For Passenger At Saharanpur Railway Station On Camtech Pattern In The Section Of Sse/W/L/Sre Under Aden/Sre.
Upgradation Of Existing Coach Watering Arrangement To Quick Coach Watering System In Platform No.1 At Has Station
Provision Of Rcc Over Head Tank In C/W Quick Coach Watering Arrangement On Platform No. 1 To 6 For Passenger At Saharanpur Railway Station On Camtech Pattern
Provision Of Deep Tubewell And Pump House In C/W Quick Coach Watering Arrangement On Platform No. 1 To 6 For Passenger At Saharanpur Railway Station On Camtech Pattern
Provision Of Rcc Over Head Tank In C/W Quick Coach Watering Arrangement On Platform No. 1 To 6 For Passenger At Saharanpur Railway Station On Camtech Pattern In The Section