Echp-Ii- Segregation Of Lump Coal And Stones Accumulated Under Rc-2C Hopper And Transporting Coal And Stone To The Respective Yard After Weighment.
Work Contract For Unloading Of Coal At Track Hopper Of 1 X 210 Mw Ph-Iii By Opening Gates Of Mppgcl Own Wagons And Bobrn Type Wagons Of India Railway, Breaking And Pushing The Coal Into Track Hopper At Atps Mppgcl Chachai
Repairing, Strengthening And Jacketing Of Columns Of Coal Table Of Track Hopper And Pressure Grouting Work To Check Seepage At Various Locations At Rtps, Dvc.
Repairing Of Coal Receiving Hopper Plate Of Mainframe A.c Make Local Sl No. 02, Feeder Breaker Installed At Tarmi Siding Under Sdocm Project
Hopper Cleaning And Breaking Of Oversize Coal/ Stone Boulders Over Hopper Mesh Of Wagon Tippler Of Coal Handling Plant, B Tps Obra
Replacement Of Crusher Segments Primary N Secondary Crushers Both A N B Side Flow N Dismantling Fabrication Erection And Alignment Of Hopper Grizzly Under Raw Coal Section Of Rwp
Cleaning Of Jammed Coal In Track Hopper Along The Total Length And Cleaning Of Sticky Coal On Both Sides Of Track Hoppers Unloading Table
Gem Bids For Custom Bid For Services - Unloading Of Nalco Coal Wagon At Track Hopper-1
Transportation Of Mill Reject Coal From Reject Hopper Of Stage-ii To Stock Yard Of Mill Rejects And Clearing Of Coal Powder Collected Between The Mills And Other Mill Areas In Boiler Maintenance Division1*600mw For A Period From 01.04.2025 Or Actual Date Of Utilization To Till Date Of Completion.
Work Contract For Operation And Maintenance Along With Housekeeping Of Coal Handling Plant Of Chp-I And Manual Unloading Of Coal From Coal Rake At Track Hopper For 2X600 Mw, Phase-I, Sstpp, Mppgcl, Dongalia, For The Period Of 2 Years 24 Months