Complete Track Renewal Using Contractor's Own Pqrs Machine Between Loliem And Harwada Section From Kms 484/600 To 515/000 For Approximately 27 Km Length Including Long Chainage Of 1.4 Km And On Bridges But Excluding Tunnels, Points And Crossing Under The Jurisdiction Of Senior Section Engineer, Karwar Section In Goa And Karnataka State Over Konkan Railway.
Supply Of Adhesive For Applying Over Grooved Rubber Sole Plates For Placing Over Psc Sleepers Specially Under The Points & Crossing Area.
Execution Of P Way Works Including Laying And Linking Of Bg Track For Loop Lines No. 4 At Od Station, Loop Lines No.5 At Dakor Station And Phase-Ii Yard Remodeling Works At Anand Station Including Points & Crossing At Yards, Supply And Spreading Of Ballast, Transportation Of P Way Materials, Tamping Of Track And Other Miscellaneous Works In Connection With Anand - Godhra Doubling Project.78.80 Kms.
Nctps I Se M Ii Circle Echs Dn Supply Erection And Commissioning Of Railway Track Points And Crossing 2 Nos Point No 136 And 138 In Nctps I Siding
Miscellaneous P. Way Works Such As Pre & Post Tamping Work, Lifting And Packing Of Track And Points & Crossing, Destressing Of Track Etc. Under The Jurisdiction Of Sse/P.Way/Tld For Two Year.
Miscellaneous P. Way Works Such As Pre & Post Tamping Work, Lifting And Packing Of Track And Points & Crossing, Destressing Of Track Etc. Under The Jurisdiction Of Sse/P.Way/Byt For Two Year.
Miscellaneous P. Way Works Such As Pre & Post Tamping Work, Lifting And Packing Of Track And Points & Crossing, Destressing Of Track Etc. Under The Jurisdiction Of Sse/P.Way/Raipur For Two Years.
Miscellaneous P. Way Works Such As Pre & Post Tamping Work, Lifting And Packing Of Track And Points & Crossing, De-Stressing Of Track Etc. Under The Jurisdiction Of Sse/P.Way/Bhilai For Two Year.
Supply Of Manufacturing And Supply Of Cut Head Black Bolts Of Size 18 X 70 Mm To Rdso Drg No. T-11636 Latest Alt If Any, Use For Points & Crossing, Confirming To Irs Specifications Serial No.t-23: 2021 Redrafted Or Latest Amendment If Any..
Execution Of P Way Works Including Laying And Linking Of Bg Track For Loop Lines No. 4 At Od Station, Loop Lines No.5 At Dakor Station And Phase-Ii Yard Remodeling Works At Anand Station Including Points & Crossing At Yards, Supply And Spreading Of Ballast, Transportation Of P Way Materials, Tamping Of Track And Other Miscellaneous Works In Connection With Anand - Godhra Doubling Project.78.80 Kms.