Construction Of Pakka Check Dam And Gabion Structure Under Pmksy2.0 Of Project Pali-wdc-2 2021 Block Jaitaran
Construction Of Cause Way Cum Check Dam (1 No.), Gabion Structure (1 No), Field Outlet (8 No), Small Pond (1 No) In Juna Takhatpur Village, Wdc 2.0 Satarda Project
Injection Bore Well Recharge Structure, Bore Well Recharge Structure, Causeway Cum Check Dam, Gabion Structure.
Injection Bore Well Recharge Structure, Causeway Cum Check Dam, Gabion Structure, Bore Well Recharge Structure, Flow Chenal, Open Well Recharge Structure, West Wear.
Providing And Installation Of Rock Fall Barrier And Slope Stabilization Work On Hill Slope Behind Intake Structure Control Room At Dam Site Of Vyasi Hep
Cleaning Of Chemical Deposits From The Weep Holes Of Tilaiya Hydel Power Stations Drainage And Inspection Gallery And Removing Of Beehives In Dam Structure At Dvc, Tilaiya Dam, T. K. Division Konar
Construction Of Water Harvesting Structure- Mini Check Dam In Survey No. 84/17 At Bandoli, Kirlapal, Dabal, Dharbandora Goa
Painting The Radial Gate And Hoist Structure Of Anathode Dam And Labelling Foundation Drains, Vertical Drains, Block Joints And Other Salient Features In Kakki And Anathodu Dams Drip Ii - Sabarigiri Hep
Upstream And Downstream Treatment Of Masonry Joints, Drilling And Grouting Of Masonry Dam Structure Of Chandraprabha Dam.
Guarding Arrangement Through Registered Firm Organized By Ex-military Person For Wtp And Floating Barge Structure Site Near Murguma Dam Site Of Jhalda Augmentation W/s Scheme