Dewatering Of Various Lhs & Cleaning Of Waterway Of Lhs And Bridges In The Section Of Aden/dee
Supply Of Dewatering Pumps As Per Is 10001 (q3)
Providing And Applying Two Coats Of Exterior Acraylic Emulsion Paint Confirming To Corresponding I.s. Of Approved Manufacture And Of Approved Colour To The Plastered Surfaces Including Cleaning ,preparing The Plaster Surface, Applying Primer Coat ,scaffolding If Necessary , And Watering The Surface For Two Days Etc Complete. Compound Wall Wall Top Kerb Stone/beam Providing And Fixing Heavy Duty Inter Locking Concrete Rubber Mould Glossy Paving Blocks Of 60 Millimeter Thickness Of Having A Strength Of 400 Kilogram/sq.m Of Approved Quality And Shape On A Bed Of Crushed Sand Of 25 To 30 Millimeter Thick Including Striking Joints And Cleaning Etc. Complete. (using 100% Crushed Sand) Providing And Laying Cast In Situ/ready Mix Cement Concrete In M-10 Of Trap/ Granite/ Quartzite/ Gneiss Metal For Foundation And Bedding Including Bailing Out Water, Steel Centering, Formwork, Laying/pumping, Compacting, Roughening Them If Special Finish Is To Be Provided, Finishing If Required And Curing Complete, With Fully Automatic Micro Processor Based Plc With Scada Enabled Reversible Drum Type Mixer/concrete Batch Mix Plant (pan Mixer) Etc. Complete. With Fine Aggregate (crushed Sand Vsi Grade) Play Area Beam Excavation For Foundation In Earth, Soil Of All Types, Sand, Gravel And Soft Murum, Including Removing The Excavated Material Up To A Distance Of 50 M. Beyond The Building Area And Stacking And Spreading As Directed, Dewatering, Preparing The Bed For The Foundation And Necessary Back Filling, Ramming, Watering Including Shoring And Strutting Etc. Complete. By Mechanical Means (spec. No. : Bd.a. 1 Page 259/csr I Page No. 148) Play Area Beam Providing Soling Using 80 Mm Size Trap Metal In 15 Cm. Layer Including Filling Voids With Crushed Sand/grit, Ramming, Watering Etc. Complete. Play Area Beam Providing And Laying In Situ / Ready Mix Controlled Grade Of M20 Of Trap /granite /quartzite /gneiss Metal For Rcc Works In Cut Off Walls / Curtain Walls Including Necessary Scaffolding, Centering, Compacting By Vibrator, Finishing And Curing Etc. Complete. (with Fully Automatic Micro Processor Based Plc With Scada Enabled With Reversible Drum Type Mixer/ Concrete Batch Mix Plant (pan Mixer) With Fine Agreegates Of Required Specifications ( Vsi Sand Finely Washed Etc ), Excluding Reinforcement) Play Area Beam Providing And Fixing 900mm High S.s.304 Grade Stainless Steel Railing With 40mm Diameter And 1.5mm Thick At Top,40mm Diameter And 1.5mm Thick Vertical Supports Spaced At 1.5m Center To Center And 8mm Thick Toughened Glass Including Fabricating ,fixtures, Errecting , Necessary Welding , Grinding , Finishing, Buffing To Stainless Steel Pipe Etc. Complete Play Area Beam Transportation Of Material Obtained From Debries Of Various Sorts Including Necessary Excavation / Loosing Including Loading,unloading And Conveying And Disposing As Directed.
Procurement Of Rod Air Pump For Dewatering Purpose At Working Faces In Continuous Miner District And Lhd Sand Stowing District Of Vkp Mine, Rg2
Gem Bids For Dewatering Pump(ntpc)-is:11501 (q3)
Operation And Maintenance Of Dewatering Work In Dewatering Gallery At Jobat Project Nanpur For 12 Months
Repairs Maintenance Of Dewatering System Of Various Equipment Of Sdd And Ndd Pump Houses Which Includes 12528 M3 Hr Dewatering Pumps Qty 03 1072hp 11kv 50hz Motors Qty 03 800kw 11kv Soft Starters Qty 03 Cooling And Lubrication Pumps With Panels Qty
Restoration And Strengthening Of Damaged Portion Of Spillway Channel Sudah Nallah Foreway, Slip Mulba Clearance Of Spillway Channel Foreway And Premises Of Power House Building, Dewatering And Desilting And Slip Clearance From Power House Building Ep
Gem Bids For Dewatering Pumps As Per Is 10001 Q3
Gem Bids For Clutch Cylinder Assy, Ram Service Kit Cylinder, Maincylinder Repair Kit, Dewatering Valve Equator Assy, Mainbrake Valve, Trailer Brake Valve Repair Kit, Knucklebearing, Fuel Pump Motor, Pump Assy Oil, Gasket Cylinderhead