Repair/ Replacement Of Disinfection Dosing System Along With Agitator Dosing Tank, Chemical Feeding Pipe Line And Connected Accessories Of Ph N 5, 8, 9
Repair/ Replacement Of Disinfection Dosing System Along With Agitator Dosing Tank, Chemical Feeding Pipe Line And Connected Accessories Of Ph N 5, 8, 9 At Mil Stn Agartala
Routine/breakdown Maintenance Of Water Treatment Plant, Cpu System, Chemical Dosing Sample Collection Testing And Analyzing Of Steam Water Parameter Of 2x500 Mw, Dtps, Anpara, Sonebhadra. Breakdown Maintenance Of Wtp, , Cpu System, Chemical Dosing Sample Collection Testing Of Steam Water Parameter
Gem Bids For Ro, Sand Media Filter 13x54, Activate Carbon Coconut Beas13x54, Antiscalent Dosing Pump, Housing With Filter 5micron, Ss Multi Stage High Pressures Pump, Membranehousing 4080e2ss, Ro Membrane High Rejection 99 Point93 Persent Brackish Water 4040 Csm, Malti Part Valves 1inch In And Out Imp, Fine Filtered Water Blending Line Withmicron Filter Pvc Pipe Line And Fittings, Ms Electrical Panelwith Controls, Pressures Gauges, Rota Meter Reject Orpermeate, Ss Skeed, Uv System, Raw Water Feed Pumpwith Motor, Pipe Or Pipe Fitting, Tds Miter, Water Storagetank 500 Ltr, Water Storage Tank 1000 Ltr, Tank Stand M S3 X 8 Ft, Water Chiller 2 Ton, Mirnal Dosing System Pump, Shed Size 14x10x10 Ft
Procurement Of Ss Pipes For Fgc System And Phosphate Dosing System Of Unit-5 & 6 Boilers
Procurement Of Sbv Heads For Long Retractable Soot Blowers Of 500mw Boiler/unit-7/dr.nttpss Pipes For Fgc System And Phosphate Dosing System Of Unit-5 & 6 Boilers
Maintenance And Repairs To Chemical Dosing System Including Consumables For Water Supply Installations
Repair/replacement Old Unserviceable Rusted Gi/ppr/di Pipe Line And Sluice Valves, Gate Valves, Valve Chamber And Maint Of Chemical Dosing System With Acessiories And Repair/maint And Servicing Of Dg Set, Pump Set Engines, Replacement Of Other Allied
Providing Installation And Commissioning Of Dosing System For Decontamination Of Drinking Water By Chemical Treatment At Uwss Riwer Head Works Balotra With 2 Year O And M
Installation Of Coal Slurry Settling Plant Cssp For Unit 1 To 6 And Dosing System For Existing Cssp Of Unit 7 And 8 Chp, Mtps