Earthwork For Cess Repair In The Section Of Aden-1
Earthwork Involving Preparation Of Ground And Terracing For Development Of Park And Development Of Low-Cost Open-Air Theatre Under Scheme Sasci 2025-26
Design, Drawings, Earthwork, Fencing Foundation, Site Readiness, Equipment Foundations, Control Building, Battery Room, Cable Trenches, Etc., Including General Services Works & All Miscellaneous Works For 132/55 Kv Traction Substation, Sectioning Post (sps), Sub Sectioning Post (ssps) In 2 X 25 Kv Traction System (scott Connected Transformer) Of Bhusaval- Burhanpur Sections Of Central Railway, To Meet 3000 Mt Loading Target
Design, Drawings, Earthwork, Fencing Foundation, Site Readiness, Equipment Foundations, Control Building, Battery Room, Cable Trenches, Etc., Including General Services Works & All Miscellaneous Works For 132/55 Kv Traction Substation, Sectioning Post (sps), Sub Sectioning Post (ssps) In 2 X 25 Kv Traction System (scott Connected Transformer) Of Burhanpur-khandwa Sections
Demolishing Stone Rubble Masonry Cement Concrete Brick Work And Rcc Work Earthwork Excavation Random Rubble Masonry Pcc Rcc Centering And Shuttering Conveying The Newly Casted Slabs Filling Earth Structural Steel Work Plastering Works Etc 220 Kv Substation Kaniyambetta - Renovation And Extension Of Control Cable Trench In Yard
Rehabilitation Of Earthwork From 41.146 Km To 41.245 Km For A Length Of 99Mt Of Distributory 2L Of Tmlc For Ensuring Boro Irrigation In Ps-Kotwali, Block-Sadar, Dist Jalpaiguri During 2025-26. Wbiw/Ee/Tid/E-Nit- 05/2025-26/3
Earthwork In Embankment, Cutting And Bridge Approaches And Construction Of Minor Bridges,supply Of Ballast & Pway Work/track Work In Connection With Ankai Yard Remodeling Excluding Bypass Line / Chord Line At Ankai Station.
Providing Bricks Boundary Wall & Earthwork Around Existing Alh- 1 To 13 Of S&t Deptt Between Dmg-bst Section.
Road Repairing With Piling And Earthwork At Pond Of Sarat Kayal Ps 25
Improvement Of Existing Irrigation Infrastructure Works On 1 L Sub Minor Ex Parvat Minor Of Kosamba Branch Necessary Earthwork And 7.50 Cm Thick M-15 Lining