I Construction Of Sump Alongwith Drainage Arrangement For Avoiding Water Logging At 7 Nos Lhs Rub No. Nn-171, Nn-173, Nn-184,, Nn- 187, Nn-188, Nn-192 & Nn-194 Ii Epoxy Treatment Of Leakage In 25 Nos Rub In Nbq-Glpt-Kyq Section. Project Id. 08.04.30.25.4.53.001
Gem Bids For Civil, Cleaning Sand Stone, Water Proofing Treatment 1, Waterproofing Treatment 2, Epoxy Grouting, Dismantling Tile, Vitrified Tiles, Grouting, Putty, Emulsion Paint, Exteriorpaint, Enamel Paint, Unforeseen Items
Providing Protective Epoxy Treatment To The Concrete Surfaces Of The Hot Water Out Fall Structures
Providing Protective Epoxy Treatment To The Concrete Surfaces Of The Hot Water Out Fall Structures
Providing Protective Epoxy Treatment To The Concrete Surfaces Of The Hot Water Out Fall Structures
Providing Protection To Top Concrete Of Spillway And Bucket Of Karjan Dam By Applying Epoxy Treatment.
Providing Epoxy Mortar Treatment From Upstream Side To Piers In The First Bay Of Ujjani Dam For Stopping Water Leakage Through Construction Joints.
Supply of Center Stiffener For Head Stock To Drg. No.T-1-2-513 With Alt. N/30, Item No.2. Material A Nd Specification As Per Drg. Warranty Period: 30 Months After The Date Of Delivery Head Stock Beam To Icf Drawing No. Icf/Std-1-2-002.Alt.M, Item No. 10 With Material T O Specn. Is:2062-2011, Amend-1 Of Nov-12, E 250 Cu Quality `C` . Note: Surface Treatment Inclu Ding Epoxy Primer On Entire Item Shall Be As Specified In Note No :4 & 5 Of Icf Drg. No.Icf/ Std-1-2-001 Alt-K/5. Warranty Period: 30 Months After The Date Of Delivery
Protection Work Of Weir Epoxy Treatment In Head Work Of Rajiv Samoda Nisda Diversion Scheme Phase I, Block-Arang
Protection Work Epoxy Treatment Work Of Weir Under The Head Work Of Rajiv Samoda Nisada Diversion Scheme First Phase Of Arang Development Block