Repair/ Maint To Misc E/M Fittings/ Fixtures Related With Gas Pipe Line, Connected Bed Head Panel And Connected Wiring In Certain Works At Ch Ec Under Ge Alipore
Removal Of Old Insulation, Surface Preparation, Supply Of Insulation Material And Application In Overhead Steam Pipe Lines Along With Associated Pipe Fittings, Vessels At Assam Gas Based Power Station, Bokuloni, Dibrugarh Assam.
Removal Of Old Insulation, Surface Preparation, Supply Of Insulation Material And Application In Overhead Steam Pipe Lines Along With Associated Pipe Fittings, Vessels At Assam Gas Based Power Station, Bokuloni Supply Of Insulation Material And Application In Steam Line Piping.
Amc Service Of Kitchen Fire System 1 Yr Hp Test Valve Servicing Cylinder 30 Ltr Cylinder Refilling Sensor Cable Lhs Nozzles Inner Outer Gas Shut Valve Pipe Fittings Transporation Charges
Supply of Installation Of Galley Fire Suppression System, 5 Installation Of Galley Fire Suppression System Fusible Link Bracket Fusible Link - 182 Degree Celsius - 06 Nos Hooter And Flasher - 01 Nos Ss Pipe And Fittings - 01 Nos Gas Shutoff Valve - 01 Nos
Provn Of Mechanical Chimneys At Cook Houses Of Snco Mess And No. 1 2 Airmen Mess Along With Accessories Fittings Of Gas Pipe From Exterior To Cook House And Cages For Gas Cylinder And Improvement To Cook House Of Offr Mess
Provn Of Mechanical Chimneys At Cook Houses Of Snco Mess And No. 1 2 Airmen Mess Along With Accessories Fittings Of Gas Pipe From Exterior To Cook House And Cages For Gas Cylinder And Improvement To Cook House Of Offr Mess
Remaining Work Necessary For Completin Of Package Ruisdp Pali 02 In Uwss -Supply, Installation, Testing And Commissioning Of Following Capacity Air Blowers Coupled With Suitable Capacity 415V 3 Phase 50Hz Ac Induction Motor Complete With Base Frame, Suction Air Filter, Silencer, Pressure Relief Valve, Delivery Non Return Valve Complete With All Required Accessories, Providing, Installation, Testing And Commissioning Of Vacuum Feed Gas Chlorinator System With All Accessories And Making Connection With Existing Pipeline Required Including Supply & Installation Of Ejector Unit, Vacuum Chlorination Unit, Trunnion Roller Support, Auxiliary Container Valve, Flexible Copper Connector, Manifold Valve, Tonner Manifold Pipes, Chlorine Pressure Gauge, Isolation Valve, Gas Filter, Pressure Reducing Valve, Chlorine Gas Pipe With Fittings, Diffuser, Lifting Beam, Load Indicator, 25 Nb Pp Diaphragm Valve On Injector Inlet & Outlet, 32 Od Upvc Pipe For Chlorine Solution, 25 Nb Gi Pipe For Pump Suction & Delivery, 25 Nb Gm Gate Valve On Pump Suction & Delivery, 25 Nb Gm Y Type Strainer On Pump Suction, 25 Nb Gm Check Valve On Pump Delivery, Pressure Gauge With Isolated Valve On Pump Delivery And Chlorine Booster Pump With Motor Of Required Capacity Including Safety Equipment