Supply Of Bpc Generating Machine.
Supply, Installation And Commissioning Of Lipid Nano Particle Generating Machine
Gem bids for Power Generating Machine Cap 100 Kva Installationat Cemented Base Size 12 X 18 X 1 Feet
Supply Installation Of Lipid Nano Particle Generating Machine As Per Tender Specs
Supply Installation Of Lipid Nano Particle Generating Machine As Per Tender Specs Iict27062025infra-Applied Biology3
Supply of Diesel Generating Set 250Kva With Amf Panel.. Cost Of Basic Machine Diesel Generating Set 250Kva With Amf Pannel Warranty Period: 24 Months After The Date Of Delivery Cost Of The Concomitant Accessories According To Tender Specifications. Warranty Period: 24 Mo Nths After The Date Of Delivery Cost Of Comprehensive Amc For Five Years After The Warranty As Per Clause 17. Warranty Period: 2 Years, Amc Period: 5 Years, Rate Of Discounting: 10 % Cost Of Any Other Accessory Which In The Opinion Of Supplier Is Essentially Required For Making The Machine Fully Functional. . Warranty Period: 24 Months After The Date Of Delivery Cost Of Turnkey Charges Viz. Foundation, Installation & Commissioning Etc. Cost Of Preventive Maintenance During 1St & 2Nd Year Of Warranty Period. Supply And Fitting Of Exhaust Pipe Along With Support Structure As Per Clause 1.3.12 Of Section V 5.0 Meter Length. Note: 5.0 Meter Length Is Mentioned For Commercial Evaluation Purpose Only. Bidder Should Quote Per Meter Rate For Supply And Installation Of Exhaust Pipe Along With Support Structure. Payment Shall Be Made To T He Bidder By Actual Requirement. Optional Accessories With Break Up Of Individual Items As Specified In Clause 4.3 Of Section- Iv. W Arranty Period: 24 Months After The Date Of Delivery
Supply of 1 Paper Generating Machine Capacity 25-30 Kg Per Day Q3
Supply of Electric Generating Machine, 105 Electric Generating Machine Lancer Set Lancer Flag Radium Tape Retro Tape
Supply of Electronic enforcement Equipment- E-Challan Generating Machine
Supply Of Electronic Enforcement Equipment -E-Challan Generating Machine