Construction Of Main Gate With Security Goomty And Seven Nos Small Gates At Purbapalli Area And Near Central Administrative Building, Santiniketan Vb/Cps/958/2025-26
Comprehensive Annual Maintenance Contract Of 131 Nos. Datalogger, 06 (six) Nos. Front End Processor (fep) & 141 Nos. Remote Terminal Unit At Various Goomty/gate Lodge/ibh (efftronics Make) For A Period Of 05 (five) Years In Adra Division
Provision Of Goomty For P.man In Off-side Station Building.
Provision Of 07 Nos Goomties (auto Cum Gate Goomty) In Connection With Auto Section In Balu-kit Section Under The Jurisdiction Aden Balugaon Of Khurda Road Division.
Provision Of 09 Nos Goomties (auto Cum Gate Goomty) In Connection With Auto Section In Kit-gam Section Under The Jurisdiction Aden Balugaon Of Khurda Road Division.
Balance Work Of Earthwork In Formation For Railway Bg Embankment, Blanketing Work As Per Rdso Specification, Construction Of Major Bridge Bridge-04, Minor Bridges, Station Building, Platform, Fob, Pp-shed, Circulating Area, Gate Goomty, Loaction Hut, Auto Hut, Retaining Wall, Drain, Protection Work And All Other Connected Ancillary Works From Chainage Km 1.338 To Km 12.4 Of Kir-kuq Section In Connection With Katihar- Kumedpur Doubling Project Of N. F. Railway Construction.
Hubballi Division: Sw-I : Proposed Construction Of Goomty Building One At Each Endat Bellary Cant And Kudatini Stations For Modernization Of Signaling System By Provision Of Electronic Interlocking System. Sw-Ii: Proposed Construction Of S&T Building At Bellary Cant And Kudatini Stations For Modernization Of Signaling System By Provision Of Electronic Interlocking System Maintenance Period:3 Years.
Hubballi Division:Sw-I: Proposed Construction Of Goomty Building One At Each End At Papinayakanahalli, Kariganuru Stations For Modernization Of Signaling System By Provision Of Electronic Interlocking System.Sw-Ii : Proposed Construction Of S&T Papinayakanahalli, Kariganuru Stations For Modernization Of Signaling System By Provision Of Electronic Interlocking System Building. Maintenance Period: 3 Years.
Comprehensive Annual Maintenance Contract Of Integrated Power Supply System Statcon Energiaa Make - 02Nos. I.E. East & West Goomty At Joychandipahar Joc Station Of Adra Division For A Period Of 05 Five Years.
Electrical Work For Provision Of New Elb With Gate Goomty At 5 Nos Of Lc Gates Ka-27, Ka-72, Ka-157, Jc-14 & Jc-40To Replace The Gate Lodge From Existing Old End Cabin Lever Frame In Adra Division.