Constriction Of Formation Filling Earthen Shoulders Constriction Of Edge Walls Providing Laying Gravel Soil Aggregate Base Water Bound Macadam G Ii G Iii And Providing Laying M 40 Interlocking Concrete Block Pavement Repair Of Affected Damaged Length Of Paral To Bhogarawan Road Km. 0.00 To 8.845 Under Pdna 2023
Construction Of Formation Filling Earthen Shulder Construction Of Edge Wall Providing Laying Gravel Soil Aggregate Base Water Bound Macadam G Ii G Iii And Providing Laying M 40 Interlocking Concrete Block Pavement Repair Of Affected Damaged Length Of Mand Mnjwan To Mand Indora Road Km. 0.00 To 3.250 Under Pdna 2023
Improvement And Metalling Of Barotiwala To Banalgi Road In Km. 37/00 To 70/00.Sh C/O R/Wall, B/Wall In Pcc And Wire Crates At Various Rds, P/L Gsb, 80Mm Thick Interlocking Tile Pavement And Repair Of Existing Slab Culvert Between Km. 37/00 To 70/00 Improvement And Metalling Of Barotiwala To Banalgi Road In Km. 37/00 To 70/00
Repair Of Interlocking Pavement At Park Lane And Footpath At Shankar Road Repair And Maintenance Of Infrastructure Assets In R V Division During 2024 25.
Side Track And Pavement Interlocking Repair Work From Airport Mode To Transport Nagar Metro Station Under Sarojini Nagar Ward.