Auction Sale Of Iron Ore Clo And Fine
Mechanised Excavation, Loading, Transportation And Unloading Of 7.00 Seven Lakh Tones Of Iron Ore Fines From Fine Ore Dumpfod To Dep- 5 Fine Ore Stockpile/Hopper Through Lp Weigh Bridge No-3 At An Average Distance Of 1.90 Kms
Mechanized Excavation, Loading, Transportation And Unloading Of 7.00 Lakh Tones Of Iron Ore Fines From Fine Ore Dump To Dep – 5 Fine Ore Stock Pile / Bopper Through Ip Weigh Bridge No-3 At An Average Distance Of 1.90 Kms Approx As Nad When Required
Mechanized Excavation, Loading, Transportation And Unloading Of 1.0 Lakh Tons Of Iron Ore Fines From Fine Ore Dump Fod To Dep- 10/11A Fine Ore Stockpile Lp Through Weigh Bridge At An Average Lead Distance Of 3.5 Kms One Way Approx. As And When Requ
Mechanized Excavation, Loading, Transportation And Unloading Of 3.00 Three Lakh Tons Of Iron Ore Fines From Fine Ore Dump Fod To Conv. 305 Hopper At Fod Area In Average Lead Distance Of 0.50 Km One Way Approx.
Consultancy Services For Study And Preparation Of Tefr For Modification Of Berth No 8 For Iron Ore Fine Iof For Kiocl Ltd