Tender For Work Of Loading And Unloading Materials At Divisional Store Office Under Dhrangadhra Division Office.
Loading / Unloading Labour Work Under Store / Tms Section Under Nakhatrana Division.
Online E-tender For Bi-annual Rate Contract For The Work Of Taking Delivery, Loading, Unloading Stacking And Transportation Of Any Material/equipments From Any Store Of Getco To Any Store / Ss /site Of Getco.
E-tender For Labour Work For Loading Unloading Of Material At Bavla Do Store. Rfq-78640
Safely Cartage Of Pcc Pole 8.5 Mtr. Long From Esc, Sre To The Site Of Work Including Loading Unloading At Both Ends. (dist. Up To 30 Km.) Safely Cartage Of Pcc Pole 11 Mtr. Long From Esc, Sre To The Site Of Work Including Loading Unloading At Both Ends. (dist. Up To 30 Km.) Safely Carriage Of Line Material Esc Sre To Site Of Works Through Privet Vehicle Including Loading And Unloading At Both Ends. (distance 0 To 30 K.m.) Safely Carriage Of 11 Kv Ct/pt Metering Combine Unit From Esc Sre To Site Of Work Including Loading And Unloading At Both Ends. Safely Carriage Of 11 Kv Metering Cubical 30/5 A From Esc Sre To Site Of Work Including Loading And Unloading At Both Ends. Safely Carriage Of 11 Kv Xlpe Cable 3x70 Sq.mm From Esc Sre To Site Of Work Including Loading And Unloading At Both Ends. Safely Carriage Of Weasel Conductor From Esc Sre To Site Of Work Including Loading And Unloading At Both Ends. Safely Carriage Of Rabbit Conductor From Esc Sre To Site Of Work Including Loading And Unloading At Both Ends. Safely Carriage Of 11 Kv Xlpe Cable 3x120 Sq.mm From Esc Sre To Site Of Work Including Loading And Unloading At Both Ends. Fabrication And Erection Of Double Pole On Pcc Pole 8.5/11 Mtr. Long With Complete Fitting Of All Accessories Of 11kv/ Lt Line As Per Respo Specification. Erection Of Single Support On Pcc Pole Up To 11/8.5 Mtr Long With Complete Fitting Of All Accessories Of 11 Kv/lt As Per Respo Specification Providing And Fixing Of Gi Pipe 6” Dia Earthing Of Pole By Earthing Rod. Providing And Fixing Of Clamp With Nut & Bolt Concreting Of Pole Laying, Lifting, Stringing, Sagging Jumpring & Binding Of Acsr Weasel Conductor For 11 Kv/lt Line As Per Respo Specification Including Complete. Laying, Lifting, Stringing, Sagging Jumpring & Binding Of Acsr Rabbit Conductor For 11 Kv/lt Line As Per Respo Specification Including Complete. Providing And Fixing Of Stone Pad 300x300x75 Mm Providing And Fixing Of Danger Board With Clamp Providing And Fixing Of Barbed Wire Safely Installation Of 11 Kv Ct & Pt Metering Combine Unit 30x/5 A Safely Installation Of 11 Kv Metering Cubical 30/5 A Grouting And Fixing Of Stay Rods By Digging Of Pits In Block Of 600x600x300 Mm. & With New Brick And Nozzling Of Stay Wire 7/10 Swg And Fitting The Same On The Pole Concreing Of Stay Laying Of 11 Kv Xlpe Cable 3x70 Sq.mm Laying Of 11kv Xlpe Cable 3x120 Sq.mm For Line Crossing Making And Filling The 11 Kv Cable Jointing Kit Indoor/outdoor Type Size 3x70 Sqmm. Sq.mm As Per Respo Specification. Making And Filling The 11 Kv Cable Jointing Kit Indoor/outdoor Type 3x120 Sqmm. Sq.mm As Per Respo Specification. Fabrication Charge Of Channel And Angle
Loading Unloading Work Of Material For Mangrol Division Store E-tender Mangrol Do Store 800000
Gem Bids For All Company Salts Production Areas Salts Transportation, Loading And Unloading Work By Rail To Sambhar Central Stores. , Transportation, Loading And Unloading By Rail From Main Line Pan Works Platform To Sambhar Central Stores 5 To 7 , Transportation And Heaping Work Of 10 To 12 Meter Hight At Sambhar Central Stores No 1 To 8 , Transportation And Heaping Work Of 10 To 12 Meter Hight At Sambhar Deodani Store No. 9-10 , Transportation And Heaping Work Of 10 To 12 Meter Hight At Gsr Or Gudha Kyar Platform , The Work Of Extraction, Transportation And Storage Of Salt At Nawa Kyar Nos 16 To 48 And 50 To 52 To Nsr Or Nawa Kyar Platfrom , Transportation And Heaping Work Of 10 To 12 Meter Hight At Nsr Or Nawa Kyar Platform , The Work Of Extraction, Transportation And Storage Of Salt At Nawa Kyar Nos 49, 54 To 60 To Nsr Or Nawa Kyar Platfrom
Off Loading Work Towards Installation Of Pump And Motor Assy With Forced Sprinkling And Water Monitor Arrangements In 02 Nos Converted Water Tankers Of Dudhichua Project
Providing Unskilled Labors For The Work Of Loading, Unloading, Stacking, Shifting Of Materials & Other Misc. Work As Per Scope Of Work At Main Store, Kltps For 18 Months On As And When Required Basis
Belrayan Sugar Bag Handling, Shifting In Godown And Loading Work For Season 2025-26