Of The 23 Newly Included Gavans, Nandoshi, Sanas Nagar Gavans Water Supply Was Replaced By Karnari, The Old And Dilapidated Pressure Water Pipeline And M.s. Line Laying Work
Laying, Dismantling, Shifting Of Ms Pipeline 300mm, 250mm, 200mm, 150mm, 100mm Dia For Mine Dewatering, Fire Fighting And Sprinkler Operation At Gocp, Of Basundhara Area.
Laying Pvc, Di Pipeline, Ms Pipeline And Polder Pump Along With Pumping Machinery At Booster Phase 2 Sas Nagar Including Additional Connection From Rising Main Pipeline And All Other Work Contingent There Too
Laying 1700 Mm Dia M.s. Pipeline By Micro Tunneling Method For Railway Crossing For Laying 1400 Mm Dia M.s. Carrier Pipe
Supplying And Laying Of M.S. Pipeline And Other Allied Works Near Kristapur Pry. School For Kristapur Village Under Shyampur Zone- E Under Saltora- Chhatna Block Water Supply Scheme Brgf Ph - I Project Niet No. - 01 Of The Fy 2025-2026 Of The Ae/Bqa H.Q, Phe Dte. Sl.No-11
Supplying And Laying Of M.s. Pipeline And Other Allied Works At Durlavpur Village Under Salma Water Supply Scheme Zone- Ii Under Bankura Division, Phe Dte. Block- Saltora Niet No. - 01 Of The Fy 2025-2026 Of The Ae/bqa H.q, Phe Dte. Sl.no-16
Supplying And Laying Of M.s. Pipeline And Other Allied Works At Parasia More For Jirrah Village Under Hapania Zone- D Under Saltora - Chhatna Block Water Supply Scheme Brgf Ph - I Project Under Bankura Division, Phe Dte. Block- Chhatna Niet No. - 01 Of The Fy 2025-2026 Of The Ae/bqa H.q, Phe Dte. Sl.no-13
Supply, Delivery And Laying Of 600Mm Diameter Ms Pipeline Beside 4No. Bridge By Hdd Method Across The Railway And Other Obstacles Portion For Improvement Of Filtered Water Supply At Eastern Part Of The 4No. Bridge In Ward No. 59 And 65. Kmc/Ws-Central/15/2025-2026
Supply Delivery And Laying Of 450mm Diameter Ms Pipeline From Park Circus Booster Pumping Station To Suresh Sarkar Road Near Poddmapukur Along Surawardy Avenue, Cit Road In Ward No. 64, 60 And 54. Kmc/ws-central/16/2025-2026
Supply, Delivery And Laying Of 600Mm Diameter Ms Pipeline At Both Side Of 4No. Bridge And Connections With Existing Pipeline To Improve Water Supply At Eastern Side Of 4No. Bridge In Ward No. 59 And 65. Kmc/Ws-Central/18/2025-2026