"नये भारत का नया Tender Portal"
Request a call back

Latest Tenders for pipe bridge

Total 437 tenders found
#TBR: 35791438 Live

Construction

  • Jammu And Kashmir
  • Due On: 10 Nov, 2025 (1 Days Left)

Construction Of Pipe Culvert/foot Bridge Near Middle School Tujkhanand Near Eidgah Nazir Ah Malla

1.48 Lacs
View Tender
#TBR: 35784976 Live

Construction

  • Telangana
  • Due On: 15 Nov, 2025 (6 Days Left)

Construction Of Cisterns And Laying Of Pipe Line At Bridge Point Right Side Area In Medaram Jathara Of Ss Tadval M Bit -ii

13.27 Lacs
View Tender
#TBR: 35687839 Closed

Construction

  • Jammu And Kashmir
  • Due On: 30 Oct, 2025 (0 Days Left)

C/o Pipe Culvert/foot Bridge Near Middle School Tujkhan And Near Eidgah Nazir Ah Malla

1.48 Lacs
View Tender
#TBR: 35650846 Closed

Water Supply And Drainage

  • Kerala
  • Due On: 22 Oct, 2025 (0 Days Left)

Deposit-Pattanakad Block Panchayath- Laying 180 Mm Hdpe Pipe Line Along Kadathukadavu Bridge For Reducing Water Scarcity In Ward 1 And 16 Of Kuthiyathodu Panchayath-Pipeline Work. Deposit-Pattanakad Block Panchayath-Laying 180 Mm Hdpe Pipe Line Along Kadathukadavu Bridge For Reducing Water Scarcity In Ward 1 And 16 Of Kuthiyathodu Panchayath-Pipeline Work

5.71 Lacs
View Tender
#TBR: 35629644 Live

Railway Transport

  • Maharashtra
  • Due On: 18 Nov, 2025 (9 Days Left)

A Akyn - Kjt:-Replacement Of Old Stone Top/Rail Top Bridges 59/3, 60/1, 63/3, 63/6, 64/1, 64/2, 65/2, 65/3, 65/3A, 66/3, 66/5 By Rcc Box/Pipe To Match Bridge Configuration With Mrvc New Bridge Work Of 3Rd & 4Th Line In Kyn-Kjt Section. Bclosure Of Existing Old Bridges 58/2, 62/4, 63/4, 66/2, 66/5, 67/1, 67/5 After Construction Of Bridges By Mrvc In Kyn-Kjt Section Under Aden/T/Kyn Section. Baugmentation Of 83/2, 86/3, 88/6, 90/3 Water Way Bridges By Replacing Small Stone Top Bridges To Avoid Flooding In Kyn-Kjt Section. Project Id No. 01.02.32.24.3.51.010 C A Kyn-Kjt:- Rehabilitation Of Arch Bridges By Jacketing Of Br. No. 65/2, 69/5, 72/4, 73/1 And 74/2. B Protection Of Embankment Of Br. No. 70/3 Raw To Barrage By Provision Of Retaining Wall/ Gabion On Both Up And Dn Side. D Kalyan- Karjat :- Jacketing And Increasing Barrel Length Of Br. No.51/3, 52/4, 75/1, 76/1, 77, 1, 77/2, 78/1 In Kyn -Kjt Section Under Aden T Kyn.

17.68 Crore
View Tender
#TBR: 35603092 Closed

Municipal Corporation

  • Rajasthan
  • Due On: 27 Oct, 2025 (0 Days Left)

Construction Of Brick Wall And Laying Of Rcc Pipe Near Under Bridge Khairthal Work No. 046

Ref. Document
View Tender
#TBR: 35579747 Closed

Railway Transport

  • Madhya Pradesh
  • Due On: 05 Nov, 2025 (0 Days Left)

Part A:-Repair And Maintenance For Heavy Leakages Of Pipe Line From Bina River Pump House To Bina Filter House And Heavy Repairs To Bina River Pump House. Part B Heavy Repairs To Jhagda Nala Bridge Of Pipe Line Crossing From Bina River Pump House To Filter House.

1.76 Crore
View Tender
#TBR: 35558552 Closed

Railway Transport

  • Karnataka
  • Due On: 29 Oct, 2025 (0 Days Left)

Rrb-Tlgp Section: Proposed Replacement Of Existing Rcc Siphon Pipe 1X600mm Dia. Bridge No.126 At Km. 78/900-79/000 With Rcc Box Of Size 1 X 1.2M X 1.35M Clear Height 1.2M Between Smet-Kmsi Stations. Cut & Cover Method - Launching By Crane

60.10 Lacs
View Tender
#TBR: 35491584 Closed

Railway Transport

  • Maharashtra
  • Due On: 17 Oct, 2025 (0 Days Left)

Replacement Of Small Opening Pipe Bridge By Rcc Box And Rehabilitation Of Wing Wall And Return Wall On Dd- Mmr And Pb-Snsi Section. Irpsm Id 01.04.32.25.3.00.005 Involving Repair / Strengthening Of Bridge No. 445-2 Km 445/9-10 Hawarah Bridge And Replacement Of Existing Of Pipe Bridges In To Rcc Box Culvert By Pushing Method In Dd-Ang Sec. - 330/2, 337/3 & 337/2. In Ang-Pb Sec. - 376/1, 428/1 & 430/1. In Pb-Mmr Sec. - 447/1, 456/1 & 488/1 Dn. In Pb-Snsi Sec. - 438/1, 439/1, 439/2, 439/3, 439/4, 440/1, 440/3, 441/4, 453/2, 453/3, 453/4 & 453/5 Total - 21 Nos. Bridges In Dd - Mmr Section Including Pb - Snsi Section.

5.34 Crore
View Tender
#TBR: 35474941 Closed

Canal/irrigation/dam Work

  • Madhya Pradesh
  • Due On: 27 Oct, 2025 (0 Days Left)

On Turnkey Basis Construction Of Roads Including High Level Bridge, Slab Culvert, Hume Pipe Culvert Affected By Submergence Area Under Banda Major Irrigation Project, As Per Detailed Scope Of Work But Not Limited To That.

28.77 Crore
View Tender
Download Document