Demolition Of Existing Pipe Culvert And Reconstruction Rcc Box Culvert Type Bridge To Augment The Carrying Capacity Of Abul Fazal Drain
Construction Of Intrlocking Paver Block Road, Cement Concrete Road, In Anjar Nagarpalika Different Area At Anjar Kutch, Construction Of Ball Kridan And Coumpound Prabhukrupa Society Opp. Sankar Mandir, Construction Of Rcc Pipe Culvert In Dv High School Road Near Bhatiya Provizon Store, Construction Of Shed In Of Mamaidev Bagathada At Anjar
Construction Of Mohra Sunali Gallian Sukkar Khad Road Km 0/00 To 6/150 Sh Construction Of Rcc H/pipe Culvert 900 Mm Dia At Rds 0/460, 0/675, 1/010, 1/772, 3/840, 3/980 And Construction Of Rcc Slap 6 Mtr Span Culvert At Rd 0/860 An 3/263 And Construction Of R/wall At Rd 2/185 To 2/210, Construction Of B/wall At Rd Construction Of Mohra Sunali Gallian Sukkar Khad Road Km 0/00 To 6/150 Sh Construction Of Rcc H/pipe Culvert 900 Mm Dia At Rds 0/460, 0/675, 1/010, 1/772, 3/840, 3/980 And Construction Of Rcc Slap 6 Mtr Span Culvert At Rd 0/860 And 3/263 And Construction Of R/wall At Rd 2/185 To 2/210, Construction Of B/wall At
/l 900mm Dia R.c.c. Hume Pipe Culvert At Rd 15/250, 15/330, 15/810, R/wall At Rd 14/440 To 14/460, 15/030 To 15/040, 15/320 To 15/335, Wire Crate R/wall At Rd 15/130 To 15/150 V-shape Drain At Rd 14/750 To 15/050 Re-construction Of Nadun Bangana Road Km 0/00 To 16/695
Providing Laying 900mm Dia Rcc Hume Pipe Culvert At Rd 0/100, 0/350, 0/520, R/wall At Rd 0/070 To 0/085, Wire Crate R/wall At Various Rds P/l Cement Concrete Pavement At Rd 0/00 To 0/100 0/350 To 0/450 Restoration Of Rain Damages On Link Road From Kenchi Mod To Village Karari Km 0/00 To 0/700
Rofd In Km 0/00 To 0/800, C/o 4.00 Mtrs Span Rcc Culvert At Rd 0/470 And 600mm Dia Rcc Hume Pipe Culvert At Rd 0/550 Under Otmnp Head C/o Link Road Pipleshwar Mahadev Mandir To Village Tarkedi G.p Dangri Km 0/00 1/800
Construction Of 1x2 M Span Rcc Culvert In Damage Hume Pipe Culvert Approch Road At Kintoor To Jalpapur Via Hasnapur Link Road In Km. 1 Under Sr Yojna
Rrd On Deodhar Kheelgaloo Road Km. 0/00 To 24/500. Sh- Construction of Pcc B/wall At Rd 5/760 To 5/775, 6/325 To 6/335, 6/395 To 6/415, 7/135 To 7/150, 10/030 To 10/045, 17/690 To 17/705 And Wing Wall To Rcc Hume Pipe Culvert At Rd 10/925 To 10/930 Under Pdna
Culvert Laying Of Rcc Hume Pipe 600 Mm Dia. Near Fatik Ghosh House Apas Id - Apas/01/192/22/0008
Re-construction Of Existing Pipe Culvert With Rcc Slab Near Ravi Naik House At Chivai Under V.p. Virnoda