Rehabilitation Of N.m.e. Pipe Sewers By Trenchless Technology Using Inline Replac. Of Existing Sewers Of Fatorda Sewerage System With Hdpe Pipe By Pipe Bursting Method In Gouliwado Prt And Rd Adj. Don Bosco College And Surr.ar. In Fatorda Const. 770m
Rehabilitation Of Nme Pipe Sewers By Trenchless Technology Using Inline Replacement Of Existing Sewers Of Madgao Sewerage System With Hdpe Pipe By Pipe Bursting Method In Near Don Bosco Engineering College And Surr. Ar. In Fatorda Const. 2059 M
Rehabilitation Of Non-man Entry Pipe Sewers By Trenchless Technology Using Inline Replacement Of Existing Sewers Of Madgao Sewerage System With Hdpe Pipe By Pipe Bursting Method In Gouliwado And Surrouding Area In Fatorda Constituency.1105 M
Rehabilitation Of Nonman Entry Pipe Sewers By Trenchless Technology Using Inline Replacement Of Existing Sewers Of Madgao Sewerage System With Hdpe Pipe By Pipe Bursting Method In Dongorwado And Surrounding Area In Fatorda Constituency.760 Meters
Laying Sewer Line For Connection Of Overflow Of Septic Tank At Jsc At Harijan Balmiki Camp, Ac-36 Bijwasan Eius Capital
Repairs To Damaged Sewers At 46/14, Lock Gate Road In Ward No-006 Under Br-I, Kmc Kmc/Eec/I/006/139/2025-2026
Repairs To Collapsed Sewer At 1/17, 1/24, 1/21, 1/13, Etc. Ghoshbagan Lane In Ward No-006 Under Br-i, Kmc Kmc/eec/i/006/175/2025-2026
Repairs To Collapsed Sewer At 4, 5, Kali Kumar Banerjee Lane In Ward No-006 Under Br-I, Kmc Kmc/Eec/I/006/190/2025-2026
Repairs To Sewer At 8/2/b, 9/1, B.t. Road In Ward No 006 Under Br-i, Kmc Kmc/eec/i/006/166/2025-2026
Conversion Of Open Drain To Ug Sewer In 22A, Lockgate Road In Ward No-006 Under Br-I, Kmc Kmc/Eec/I/006/197/2025-2026