Providing New Connection As Required And Caring Out Maintained And Repair Work Of The Pipeline Laid Under Sewerage Phase 1
Providing New Connection As Required And Caring Out Maintaince And Repair Work Of The Pipeline Laid Under Sewerage Phase 1 In Kulgaon Badlapur Municipal Council West Side
Cleaning Of Sewerage Pipeline, Sump, Septic Tank, Construction Of Manhole Cover For Open Manholes And Connection Of New Sewerage Pipe At Aiims
Incomplete Sewerage Pipeline Laying Work From Taskawa To Bhadarniya Nada In Guda Balotan Work Under Rule 181 In Gp Guda Balotan
Crossing Of 1X800 Mm Dia Drainage /Sewerage Pipeline Through 1X1000mm Dia Casing Pipe Under Railway Track At Km. 4/7-8 Between Narwan - Gurthuri On Nrw- Kkde Section.
Labour Work For Replacing Old Grp Rising Main And Laying Of New 1000 Mm Dia Ms Sewerage Rising Pipeline For Variyav-1 Khadi Sps And Old Pal L.p.savani Sps In West Drainage Zone, Smc.
De-silting Of Master/main Sewerage Pipeline In Ward No. 32, Zone-ii, Division No. 2b, Zone-ii, Mcg
De-silting Of Master/main Sewerage Pipeline In Ward No. 30, Zone-ii, Division No. 2b, Zone-ii, Mcg. Recall
De-Silting Of Master/Main Sewerage Pipeline In Ward No. 30, Zone-Ii, Division No. 2B, Zone-Ii, Mcg.
Rough Cost Estimate For Repair And Laying Of Old Damaged Storm/sewerage Pipeline At Firni Of Village Kumbra In Ward No. 26