Mjf-Mly Section: Work Shops/Lgd :1. Ctrs-3.10 Km At Tsmdemu Car Shed, Carriage Work Shop And Diesel Loco Shed 2. Sc-Mue Section : Trolley Refuges And Fixing Of Boundary Pillars With Released Psc Sleepers Inder Sse/P.W/Med Section Of Main Lines
Scr Construction Organisation - Nanded Division - Conversion Of Track From Mg To Bg Between Akola-Akot Stations: Conversion Of One Train Only System Of Working To Absolute Block System Of Working Duly Constructing Of Terminal Station, Ttm Siding Platforms, Ttm Rest Rooms At Akot Station, Connected Works Related To Crossing Stations, And Other Miscellaneous Works For Existing Station Buildings, Cop, Fob, Platforms Etc At Ugwe, Patsul, Gandhi Smarak And Akot . Transportation Of Rails, Sleepers & P-Way Materials, Laying & Linking Of Bg Track Assembling, Insertion Of Points And Crossings Ugwe, Patsul, Gandhi Smarak And Akot In Maharashtra State And Surface Connection / New Crossing Station In Mp State.
Secunderabad Division -Wd-Sc Section: Sw-1. Ctr P Of Exg. 52Kg/60Kg/72Uts/90Uts Rails On Psc5 Sleepers 1540Nos/Km Density With New 60Kg/90Uts Rails On Psc6 Wide Sleepers 1660 Nos./Km Including Recoupment And Increasing Of Ballast Cushion To 35 Cm. And Deep Screening Of Ballast For A Total Length Of 2.56Km As Per Annexure. Sw-Ii: Ttrr Fs+Tws+Wcmsc:- Through Turnout Renewal Of Exg. 52/60Kg Switches, Lead Rails And Crossings In Running Lines With New Fan Shaped Layout 60 Kg Thick Web Switches With Wedable Cms Crossing Incl.Lead Rails On Fan Shaped Layout For A Total 42 Sets. 1 In 8.5--10Sets, 1 In 12--10Set, 1 In 16--3 Set, Ds-84 Sets Tws+Wcmsc- 11 Sets 1 In 8.5-11 Sets Sw- Iii: Tfr All Fittings: Through Renewal Of Fitting On Psc Sleeper Track For The Length Of 65.91 Kms Sc-Wd-65.91Tkm At Various Locations As Per Annexure.
I Secunderabad Division:- Bpq-Kzj Section Dn, Up, Ud :Ctrp Of Exg. 52Kg/60Kg Rails On Psc6 Sleepers 1660Nos/Km Density With New 60Kg/90Uts/R- 260 Rails On Psc6 Wider Sleepers 1660 Nos./Km Including Recoupment And Increasing Of Ballast Cushion To 30 Cm. And Deep Screening Of Ballast On Passenger Running Loop Lines For A Total Length Of 14.595 Kms As Per Annexure. Ii Secunderabad Division:- Bpq- Kzj Section Dn, Up&Ud Line :Trrp On Exg. 60Kg/90Uts Rails On Psc6 Sleepers 1660Nos/Km Density With New 60 Kg Rails R 260 Grade Rails For A Total Length Of 4.303 Kms As Per Annexure.
Guntakal Division: Sw-I Gtl-Wadi Loop Lines Ctrp Of Exg. 52Kg/90Uts Rail On Psc5 Sleeper With New 60Kg/R260 Rail On New Wider Sleeper 1660 Nos./Km Including Recoupment Of Ballast And Deep Screening For A Length Of 0.86Km. Sw-Ii Gtl-Wadi & Bay-Gtl : Sej & Gj: Renewal Of Switch Expansion Joint Of 16 Sets And Glued Joints Of 216 Nos. Sw-Iii Gtl-Wadi, Bay-Gtl, Klu-Gtl : Tfr On Psc Sleeper Track For A Total Length Of 49.678 Km All Fittings-41.374Km & Cgrsp-8.304Km, Sw-Iv Gtl-Wadi, Bay-Gtl : Ttr Of Exg. 52Kg/60Kg Switches, Lead Rails, Cmsc/Wcmsc And New Psc Sleepers Fsl Including Recoupment Of Ballast And Deep Screening. Fs+Tws+Wcms-27, Wcmsc-58, Tws+Wcms-19. Sw-V Sse/Pway/Bay Jurisdiction: Proposed Safety Related Yard Improvement & Upgradation Works At Various Yards. Sw-Vi Sse/Pway/Ad Jurisdiction: Proposed Safety Related Yard Improvement & Upgradation Works At Various Yards. Sw-Vii Sse/Pway/Malm Jurisdiction: Proposed Safety Related Yard Improvement & Upgradation Works At Various Yards. Sw-Viii Sse/Pway/Cen/Gtl Jurisdiction: Proposed Safety Related Yard Improvement & Upgradation Works At Various Yards. Sw-Ix Sse/Pway/Bg/Gtl Jurisdiction: Proposed Safety Related Yard Improvement & Upgradation Works At Various Yards. Locations As Per Annexure
Guntakal Division: Sw-I Gtl-Wadi Loop Lines Ctrp Of Exg. 52Kg/90Uts Rail On Psc5 Sleeper With New 60Kg/R260 Rail On New Wider Sleeper 1660 Nos./Km Including Recoupment Of Ballast And Deep Screening For A Length Of 2.238Km. Sw-Ii Gtl-Wadi Up&Dn-Tbrbcm Of Track Along With Deep Screening By Bcm For A Total Length Of 9.49 Km. Sw-Iii Gtl-Wadi : Sej & Gj: Renewal Of Switch Expansion Joint Of 1 Sets And Renewal Of Glued Joints Of 59 Nos. Sw-Iv Gtl-Wadi : Tfr On Psc Sleeper Track For A Total Length Of 2.5 Km All Fittings-1.5Km & Cgrsp-1Km, Sw-V Gtl-Wadi : Ttr Of Exg. 52Kg/60Kg Switches, Lead Rails, Cmsc/Wcmsc And New Psc Sleepers Fan Shaped Layout Including Recoupment Of Ballast And Deep Screening. Tws+Wcms-9. Sw-Vi Sse/Pway/Yg Jurisdiction: Proposed Safety Related Yard Improvement & Upgradation Works At Various Yards. Sw-Vii Sse/Pway/Rc Jurisdiction: Proposed Safety Related Yard Improvement & Upgradation Works At Various Yards. Locations As Per Annexure
Ttrprimary Of Existing 60Kg 90 Uts Rails Laid Under Psc-14 Sleepers With New 60Kg R/260/90 Uts Rails For A Length Of 22.244 Km In Patches At Km.844.12 To Km 771.91 Between Kuk- Dvd Under Sr.Den/South/Wat Of Waltair Division.
Renewal Of Existing Channel Sleepers With Tbsr H-Beam Sleepers In Various Bridges Under The Jurisdiction Of Assistant Divisional Engineer/Champa Of Bilaspur Division.
Bina - Vglj Section: Replacement Of 1806 Channel Sleepers With H-Beam Sleepers On Various Bridges Under Aden/Lar Jurisdiction.
Reconditioning By Welding Of Worn Out Insert Of Concrete Sleepers Under Sse/Ratnagiri Section.