Electrification Of 2 Nos. Stabling Line At Mohibullapur Station In Ljn Division Of N.e. Railway.
Provision Of Pit Line, Stabling Lines, Shunting Neck, Spart Line With Shed And Allied Facilities Like Pit Line Buildings, Spart Building, Retaining Wall Etc At Barmer
Various Signaling Work In Connection With:(a)provision Of Goodshed At Various Location (i)circulating Area & Road Widening At Kherwadi(ii)concrete Approach Roads To Gs-1 & Gs-2 At Lasalgaon(iii)provision Of Office, Labour & Merchant Room At Savda & Malkapur/akola/ Paras Along With Other Facility Renovation & (v)high Level Platform & Cop Development At Nashik. (b)provision Of One Common Room At Various Location Of Bhusawal Division, Two Stabling Lines In Dn Direction At Nasik Road, Development Of Track Machine Siding At Nepanagar Station, Extension Of Passenger Platform And Stabling Line At Dhule Station And Development Of Rail Grinding Machine Siding At Bhusawal Coaching Complex Yard. (c)provision Of Mridc Work:(i)rob & Lhs At Rly.km.666/07-08(ii)rob At Badnera Rly.km.662/18- 19(iii) Rub At Rly.km.545/21-22n. (d) Provision Of Rob Between New Amravati- Walgaon Stations. (e) Elimination Of Manned Lcs By Providing Subway In Lieu Of (i)lc No-13 At Kms 693.596 (ii)lc No-14 At Kms 695.764 (iii)lc No-15 At Kms 698.685 On Bd-cndb Section And (iv)lc No-17 On Badnera-narkher Section. (f)elimination Of Manned Lcs By Providing Subway In Lieu Of(i)lc No.05 On Badnera- Narkher Section (ii)lc No-12 At Kms 690.09 & (ii)lc No-11 At Kms 685.62 On Bd- Cndb Section. (g) Elimination Of Manned Lcs By Providing Subway Of Size 5.0x4.5 M By Push Through Method In Lieu Of Lc No.(1)jk-2@ Kms 538/08-09 (2)lc Nojk-5 @ Kms 543/05-06.
Design, Supply, Erection Testing And Commissioning Of 25 Kv, Single Phase, Ac Ohe Works, In Connection With Work Of I) Extension Of Up And Dn Loop Line At Waghoda Station In Bhusawal Division Of Central Railway. Ii) Extension Of Passenger Platform And Stabling Line At Dhule Station.
Connection With Running 15 Car Emu Services On Stabling Line Of Tna In Mumbai Division.
Electrical General Service Work Provision Of 580 Meter Length Coach Washing Pit Line With Stabling Line At Virangana Lakshmibai Jhansi Railway Station In Jhansi Division
Electrical Work In C/w Augmentation Of Facilities At Kolayat Goods Shed, Provision Of One Additional Spur Beside Gypsum Siding At Anupgarh Station And Provision Of Stabling Lines, Marshalling Line And Sick/fit Coaches Line In Hisar Yard Over Bikaner Division.
Electrical Trd Work In Connection With "jogbani-construction Of Stabling Line, Shunting Neck And Conversion Of Loco Reversal Line Into Pf Line
Electrical General Work And Bonding Work In Connection With Construction Of Ballast Less Track At Puri Station Yard For Platform No.1 To 8 & Provision Of One New Island Platform In Between Rt 1A-300 M, 1B-300 M & Extension Of Existing Engine Stabling Line-110 M At Puri Railway Station.
Devlali- Schi Dvl-Provision Of Inspection Pit-600M At Devlali. Schii Provision Of Yard Drain Bedevlali-Replacement Of Gang Hut At Devlali In Connection With Kumbh Mela-2027. Tween Sick Line 1-2 & Stabling Line1-2 And Connecting Drain At Devlali. Schiii Provision Of Approach Road 700X7m For Sick/Stabling Line At Devlali. Schivdevlali-Replacement Of Ssep-Way Office At Devlali In Connection With Kumbh Mela-2027. Schvdevlali-Replacement Of Gang Hut At Devlali In Connection With Kumbh Mela-2027. Schvidevlali-Replacement Of Track Machine Hut At Devlali In Connection With Kumbh Mela-2027. Schvii Devlali Station- Proposed Construction Of 15 Unit Rb-Ii Staff Quarters On Replacement Account Under Ssewksnkrd Road Juridiction In Connection With Devlali-Provision Of C&W Examination And Stabling Facilities For Kumbh Mela 2027.Id No.01.01.16.25.3.50.014