Design, Supply, Installation, Testing And Commissioning Of Indoor And Outdoor Gears Of Signaling And Telecommunication System Including Alteration In Existing Electronic Interlocking System At Cabin-3 And Cabin-4 Of Ntpc Lara
Project Management Consultancy Services For Works Of Signalling And Telecommunication System, Scada System, And Ticketing System Of Mumbai - Ahmedabad High Speed Rail Project.
Design, Manufacture, Supply, Installation, Testing And Commissioning Of Telecommunication System Except Tetra System Of Line 9 From Dahisar East To Rai And 7a Andheri East To Csmia Corridor Of Mumbai Metro Including Dongri Depot.
Project Management Consultancy Services For Works Of Signalling And Telecommunication System, Scada System, And Ticketing System Of Mumbai - Ahmedabad High Speed Rail Project.
Project Management Consultancy Services For Works Of Signalling And Telecommunication System, Scada System, And Ticketing System Of Mumbai - Ahmedabad High Speed Rail Project.
Work Contract For Round The Clock Operation Or Monitoring And Maintenance Work Of Signaling And Telecommunication System Of Secr Sgtps Siding Along Operation Of 01 No. Mechanized Non Motorized Level Crossing Gate At Sgtps Mppgcl Maintenance Work Of Signaling And Telecommunication System Of Secr Sgtps Siding Along Operation Of 01 No. Mechanized Non Motorized Level Crossing Gate At Sgtps Mppgcl
Design, Manufacture, Supply, Installation, Testing And Commissioning Of Telecommunication System Except Tetra System Of Line 9 From Dahisar East To Rai And 7a Andheri East To Csmia Corridor Of Mumbai Metro Including Dongri Depot.
Design, Supply, Installation, Testing And Commissioning Of Electronic Interlocking Based Signaling And Telecommunication System Including Single Line Automatic Block Signaling From Maho To Anuradhapura Section Of Sri Lanka Railway
Design Supply Installation Testing And Commissioning Of Electronic Interlocking Based Signalling And Telecommunication System For Cerl Ii Project In Bilaspur Division Of Secr
Design, Manufacture, Supply, Installation, Testing And Commissioning Of Telecommunication System Except Tetra System Of Line 9 From Dahisar East To Rai And 7a Andheri East To Csmia Corridor Of Mumbai Metro Including Dongri Depot.