Gem Bids For 100 M3-hr Vertical, Centrifugal, Fire Pump, On Boardspare For Fire Pump, Tools For Fire Pump, Documentation For Fire Pump, Instl And Commspares For Fire Pump, 1st Submission Of Bd For Firepump, Preservation With Consumbles Fire Pump, Training For Fire Pump, Service Engineer For Firepump, 100m3-hr Vrt, Centrifugal Bilge Pump, Onboard Spare Centrifugal Bilge Pump, Tools Forcentrifugal Bilge Pump, Docu For Centrifugal Bilgepump, Instl And Comm Spares Centrifugal Bilgepump, 1st Submission Bd Centrifugal Bilge Pump, Prservtn Consumble Bilg Cum Ballast Pump, Training For Bilge Cum Ballast Pump, Serv Engineerfor Bilge Cum Ballast Pump, 10m3-hrvrt, Centrfugal, Tech Wtr Trf Pump, Obs Centrifugaltech Wtr Trf Pump, Tools For Centrifugal Tech Wtrtrf Pump, Docu For Centrifugal Tech Wtr Trf Pump, Instl And Comm Spre Cntrfugl Tech Wtr Trf Pp, 1stsubmsn Bd Centrfugal Tech Wtr Trf Pp, Prsrvtn Consumble Cntrfugl Tech Wtr Pp, Training Centrifugal Tech Wtr Trf Pump, Servengineer Centrfugal Tech Wtr Tre Pp, 10m3-hrvrt, Centrifugal, Fw Transfer Pump, Obs Centrifugalfresh Water Transfr Pump, Tools Centrifugalfresh Wtr Transfr Pump, Docu Centrifugal Freshwater Trnsfr Pump, Instl And Commspare Centrfugal Fw Trnsfr Pp, 135m3-hrvrt, Centrifugal, Sprinkler Pump, On Boardspare Centrfugal Sprinkler Pump, Tools Forcentrifugal Sprinkler Pump, Docu For Centrifugalsprinkler Pump, Instl And Comm Spare Centrifugalsprinklr Pp, 1st Submsn Bd Centrifugal Sprinklerpump, Prsrvtn Consumble Cntrfugal Sprinkler Pp, Training For Centrifugal Sprinkler Pump, Servengineer Centrifugal Sprinkler Pump, 1stsubmsn Bd Centrifugal Fw Transfer Pp, Prsrvtn Consumble Cntrfugal Fw Trnsfr Pp, Training For Centrifugal Fw Transfr Pump, Servengineer Centrifugal Fw Trnsfr Pump, 100m3-hrvrt, Cnt., Bilge Cum Ballast Pp, Obs Centrifugalbilge Cum Ballast Pp, Tools Centrifugal Bilge Cumballast Pump, Docu Centrifugal Bilge Cum Ballastpump, Inst And Comm Spre Cnt. Bilge Cum Ballast Pp, 1st Sbmsn Bd Cnt. Bilge Cum Balast Pump, Prsrvtn Consumble Cent.bilge Ballast Pp, Training Centrifugl Bilge Cum Ballast Pp, Servengineer Cent. Bilge Cum Ballast Pp
Upkeeping And Preventive Electrical Maintenance Works Related To Lt Switchgear, Dry Type Transformers 2.5mva, And Nspbds, Lt Motorsmax 110kw And Lt Boards Max 4000a Like Mldb, Wrdb In The Bop/ytps 5x800 Mwarea Such As A Raw Water Pump House, Clarifier, Dm Plant, Cpu, Foph, Rail Unloadingfoph, Pt Plant, Fire Water Pump House, Dm Transfer Pump House, Foam Pump House, Chemical Labs And Raw Water Chlorination Plant Etc From The Date Of Commencement Of Work To A Period Of Three Months For The Fy 2025-26.
Gem Bids For Fire, Jockey Pump, Main Pump, Diesel Driven Pump, Controlpanel, Cables And Electricals, Cable Tray Ms Perforatedheavy Cable, Earthing Of Motors Gi Strip, Pressure Switch, Pressure Gauge, Pipelines 200 Nb For Discharge Header, Pipelines 200 Nb For Suction Line, Pipelines 150 Nb, Pipelines 80 Nb, Pipelines 25 Nb, Ball Valve, Non Returnvales 150 Nb, Non Return Vales 80 Nb, Isolation Valves 150nb, Isolation Valves 80 Nb, Sluice Valves 200 Nb, Sluicevalve 80 Nb, Vibration Eliminator, Air Vessel, Y Strainer200 Mm, Y Strainer 80 Mm, Vaccum Tanks, Structuralsteel, Pump For Water Transfer, Panel Automation Cablingfor Water Transfer Pump, Rain Protection Shed For Fire Pumphouse, Fire Water Tank Zinc, Rcc Fundation Pump Asdwater Tank, Air Release Valve, Analogue Addressable Firealarm Main Control Panel Honewell, Hooter Cum Strobe, Uvir Triple Detector, Smoke Detector, Probe Type Heatdetector In Flame Proof Enclosures, Ms Cable Tray, Monitormodule With Junction Box, Control Module With Junction Box, Armoured Cable Above Ground, Pipelines, Hydrant Valve, Fire Hose, Branch Pipe, Hose Box, Hose Reel, Rccpedestal, Isolation Butterfly Valves, Mvws Nozzle, Isolation Vlaves, Deluge Valve, Mvws Nozzle Fittings, Gasleakage Control Panel With Batteries, Lpg Gas Detector Inflame Proof Enclosures, Prop Type Heat Detector In Flameproof Enclosures, Hooter Cum Stroble, Control Module Withjunction Box, 2c X 1.5 Mm2 Armoured Cable Above Ground, Abc, Isi Marked Stored Pressure Type, Co2 Typeextinguisher Conforming To Is, 50 Ltr Trolley Mounted Fireextinguisher Foam Type Conforming
Overhauling Of Boiler Fill Pump Hot Well Make Up Pump Dm Water Transfer Pump A B Ot 62 Dm Water Transfer Pump A B
Procurement Of Spares For Wpil Ltd Make Waste Service Water Transfer Pump And Potable Water Pump For Offsite Maintenance At Munpl 2x660 Mw
Gem Bids For Gasket Cyl Head Cover, Brake Disc Pad Set, Front Wheelbearing, Brake Shoe Assy, Front Wheel Oil Seal, Copperwasher 13 No, Unit Head Lamp, Generator Assy, Pumpfuel Transfer, Rotary Pump Seal, Aux Water Tank Assy, Copper Washer No 14, Copper Washer No 17, Copperwasher No 19, Graduated Hand Brake Assy, 352 Dia Clutchcover Assy, Tail Light Assy 4 Chamber Lh, Front Fog Lightassy, Convoy Light, Heater Switch, Fog Light Bulb 24v, Assy Motorised Had Lamp Complete 24v, Cabin Tilt Pumpassy, Cabin Ram Assy Hyd, Fuel Feed Pump Assy, Oil Filter, Particle Filter Hvac Compact, Fuel Filter, Air Filter, End Cupfoot Step Side Rear Rh, Rear Styled Mud Flap Rh, Push Pinblack, Splash Shield Front Lh, Cover Splash Shield Front Lh
Procurement Of Mechanical Seal Assembly For Boiler Fill Pump Hot Well Makeup Pump Dm Water Transfer Pump 2 Items
Procurement Of Complete Assembly Of Filter Water Transfer Pump Withmotor Procurement Of Complete Assembly Of Filter Water Transfer Pump With
Procurement Of Spares Of Sam Make Make Up Water Pump And Overflow Transfer Pumps Installed At Ahp Of Unit No. 3 And 4, Sgtps Mppgcl Birsinghpur
Procurement Of Spares For Flowmore Make Raw Water Pump And Sludge Transfer Pump Installed At 2x250mw Units Of Ph-iv, Stps, Sarni.