Construction Of A-Lane Elevated Road Length 2.1 Km From Mithapur To Sipara Along With2 Way Rob At Sipara And 4-Lane At-Grade Road From Ram Govind Singh Mahuli Halt To Punpun Lakshman Jhula Length-2.2 Km. Total Length Of The Project -4.3 Km Along The Eastern Side Of Railway Line Frorn Mithapur-Sipara-Mahuli- Punpun In The State Of Bihar On Epc Mode.Reg.; Shifting Of Ohe Mast Instead Of Bracing Near 4Pg Spl. For Rob Construction.