The Items Included In This Estimate Are Clearing Grass, Bailing Out Water, Demolishing Cement Condemolishing Stone Rubble Masonry, Earth Work Excavation For Desilting, Lining Cc 1 3 6 For Bed And Side Lining, Sluic Chamber, Parapet Wall Near General-Pvip Action Plan 2025-26- Reconstruction Of Spout No3 In Vadayambady Md Between Ch 0.650 Km And Ch 0.680 Km For The Year 2025-