Bank Protection Work Of River Bank Right Side Of Barge From 0.00 To 22.50 M At Balua Pump Canal Including All Cost Of Mat Erial, Excluding Cement Labour, T And P Used, Complete In All Respect As Per Drawing Provided By Department. As Directed By E