Annual Maintenance Of Watch And Ward Of Water Works Site And Sweeping Of Roads At 122.12 Acre Sugar Mill Site, Budhlada For Fy 2025-26
Annual Mtc Of Water Supply, Sewerage Lines, Watch And Ward At Water Works Site And Sweeping Of Road At Spinfed Pocket, Abohar, Distt. Fazilka01.04.2025 To 31.06.2026
Shifting Of Barbed Wire Fencing And Fish Ponds At Site Of Regional Research Centre Of Icar Central Institute Of Freshwater Agriculture Bathinda Near Aiims
Development Of Horticulture Works At 80 Feet Road And Maintenance For One Year
Providing Mali-Cum-Chowkidar For Watch And Ward Of Machinery And Sweeper At Udaykaran Site, Shri Mukatsar Sahib, Fy 2025-26
Operation, Running, Maintenance And Management Of Boats And Shikara At Thermal Plant, Lake No 3, Bathinda For The Period From 01.04.2025 To 31.03.2026 Extendable Upto 10 Years
Construction Shifting Of Boundary Wall At Spinfed Site At Abohar Mandi Board Wali Jga Side
Procurement Of Design Consultancy And Engineering Consultancy Services For Design Competition Of Project Of Rejuvenation, Beautification Of The Three Lakes Namely As Lake No. 1, 2 And 3 On Goniana Road
Annual Maintenance Of Horticulture Works At 2 Parks And Road Side Plantation Of Ouvgl Site Spinfed Pocket Abohar Distt Fazilka For The Period From 01.04.2025 To 31.03.2026
Development Of Horticulture Works At 80 Feet Road And Maintenance For One Year At Baba Farid Health Science University At Faridkot.