Repairing Of India Mark-ii Hand Pump Installed At Various Villages With Providing Of Manpower, Light / Medium Four-wheeler Commercial Vehicle With Diver, Pol, Insurance, Fitness Certificate, Puc Etc. Including Supply Of Hand Pump Spares As Per Is 15500 With Latest Amendment And 32 Mm Nb Isi Marked Medium Duty Gi Pipe For One Year In Ta. Vyara, Valod, Dolvan, Songadh, Uchchhal, Nizar, Kukarmunda Of Tapi District.
Repairing Of India Mark-ii Hand Pump Installed At Various Villages With Providing Of Manpower, Light / Medium Four-wheeler Commercial Vehicle With Diver, Pol, Insurance, Fitness Certificate, Puc Etc. Including Supply Of Hand Pump Spares As Per Is 15500 With Latest Amendment And 32 Mm Nb Isi Marked Medium Duty Gi Pipe In Ta. Sayla, Chuda, Limbdi, Muli, Wadhwan, Dhrangadhra, Chotila, Thangadh Of Surendranagar District For One Year.
Repairing Work Of Vanavad Wtp At Vanavad H.w
Comprehensive O & M For Bhanvad Group Rwss 2025-26 Tal-bhanvad Dist- Devbhumi Dwarka Based On Narmada Pipe Line Nc-21.
Unit Rate For The Supply Of Drinking Water Through Tanker In As And When Required For Villages Of Rwss / Iwss
Providing, Supplying, Lowering, Laying & Jointing 110mm Dia Pvc 6kg Pipeline- 2100 Rmt From Atalnagar New T.w. To Atalnagar Main Village Sump, Construction Of Pump Cabin 2mx2m, Electrification, Pumping Machinery Under Rejuvination Programme Year 2025-26.
Construction Of 50000 Liter Capacity (12 Meter Height) Rcc Esr For Agarvada Village.(construction Level 147.85 Meter To 159.95 Meter)
Supply Of Potable Drinking Water By Water Tanker Or Hdpe Tank Mounted Truck Or Tractor For Various Villages Of
Comprehensive Operation & Maintenance Of Civil & Electromechanical Assets Such As Elevated Service Reservoirs E.s.r, Hglr, Sump, Water Treatment Plant, Chemical House, Staff Quarters, Pump House, Office Building All Bulk Transmission And Distribution Pipelines, Valves & Electrical Equipment Etc. For The Ozat-ii Water Supply Schemes, Including Supply Of 24.67 Mld Potable Water To All The 59 Villages, 02 Hamlets & 03 Towns For 06 Months Period. Taluka: - Manavadar/vanthali Based On Ozat-ii Dam. Excluding Supply Of Pac/alum, Bleaching Powder/clorine Gas Etc. Complete.
Operation, Maintenance And Repairing Of Nakhatrana Complex 5.26 Mld Wtp Under Nakhatrana Complex Rwss For 24 Month Under M & R Programme-2025-26