Construction Of 18 M Wide Road And Others Services From Nh-48 To Plot No-80, Sector-35, Phase-Vii, Gurugram. Construction Of 18 M Wide R...
Cleaning And Up-keeping Of Club Building Area At Sector-5 Imt Manesar.
Construction Of Footpath Alongwith Kerb, Channel And Paver Blocks At Various Location In Sector-35, Udyog Vihar, Gurugram Construction Of Footpath Al...
Clearing And Removal Of Rubbish Along Roads And Green Belts Dressing In Industrial Estate Phase-Ii, Panchkula, Extension-Ii. Clearing And Removal Of Rub...
Cleaning Of Sewer Line With Suction Type Machine And Jetting Machine In Industrial Estate, Phase-I, Barwala. Cleaning Of Sewer Line With...
Providing And Laying Pu Synthetic Flooring At Indoor Hall And Develop One No. Lawn Tennis Court At Netaji Subhash Chandra Bose Stadium, Palwal Under Csr Scheme Of Hsiidc. Providing And Laying Pu Syn...
Repair Of Damaged Road By Patch Work Near Plot No-57 In Sector-35, Phase-vii, Udyog Vihar, Gurugram
De-silting Of Sewer Line 800 Mm Dia By Super Sucker Machine From Front Of Plot No-89 To Ram Chowk Road Cross, Udyog Vihar, Phase-1, Gurugram De-silting Of Sewer Line 80...
Evaluation Of Structure Falling In Acquired Land Of Hsiidc 1810 Acre Scheme At Imt Manesar.
Operation And Maintenance Of Sewage Line From Sector-05, 06 And 07 For Period Of 3 Months At Hsiidc Imt Manesar.