Procurement Of Geological Standards For Xrf-facility At Geochronology
Supply Of Vme Crate Chasis With Attached Technical Specifications Annexure C
Cleaning Of Hvac Duct By Robotic, Manual, Machines, Videography Before And After Cleaning Of Air Conditioning Duct Of Iuac Buildings I.E. Bh1, Bh2, Bh3, Lab Ground And 1St Floor, Material Science Block Ground And 1St Floor, Paras Lab, Ebw Room, Etc Cleaning Of Hvac Duct By Robotic / Manual / Machines, Videography Before And After Cleaning Of Air Conditioning Duct Of Iuac Buildings
Sitc Of Miscellaneous Electrical Works Of Lt Feeder Pillar, Change-Over Switch, Junction Box, Compound Lighting And Cabling Etc. In Iuac Campus
Supply Of Vme Crate Chasis With Attached Technical Specifications Annexure C
Round The Clock Operation And Maintenance Of Air Conditioning System Phase Ii And Iii 1x263.5 Tr Screw Type, 1x245 Tr Screw Type And Associated Equipment Etc.
Supply Of High Voltage 4kv/3ma Dc Power Supply Technical Specification Annexure A
Supply, Installation, Testing, Commissioning Of Hci Control Network Infrastructure Cables And Termination Units
Supply Of Linear And Rotational Motion Feed Through Lmft
Civil And Electrical Works Irms Installation On The First Floor Of The Engineering Building At Iuac