Construction Of Vented Cross Bar Vcb Cum Causeway Across Periyar River Near Vellakkayam In Ward No. 10 And Pallikkavala In Ward No. 5 Of Vazhathoppu Gp-And Protecting Both Bank Of Cheruthoni River -General Civil Work
Maintenance Work At Hilly Aqua Aruvikkara - Manufacturing, Supply, Installation , Trial Running And Commissioning Of Fully Automatic Prefiltration Systemro At Hilly Aqua Packaged Drinking Water Plant At Aruvikkara- General Mechanical Work
Supply Of Laptops
Construction Of Check Dam Cum Bridge Across Chinnar River Kiifb-Construction Of Check Dam Cum Bridge Across Chinnar River Madampadi In Ward No 8 Of Vathikkudy Panchayath And Ward No 1 Of Nedumkandom Panchayath-General Civil Work
It Was Decided That Installing Fully Automatic Prefiltration Systemro At Hilly Aqua Packaged Drinking Water Plant Aluva For Improving The Quality Of Water. General-hilly Aqua Bottling Plant Aluva- 20 Litre Jar Production Line 600 Jph General Mechanical Work
General-hilly Aqua Bottling Plant Aluva Manufacturing, Supply, Installation, Trial Running And Commissioning Of Fully Automatic Prefiltration System Ro-general Mechanical Work
Maintenance Work At Hilly Aqua Aruvikkara-manufacturing, Supply, Installation, Trial Running And Commissioning Of Fully Automatic Prefiltration Systemro At Hilly Aqua Packaged Drinking Water Plant At Aruvikkara- General Mechanical Work
Construction Of Open Stage On The Right Bank Of Anjarakandy Rcl-At Paraparam In Pinarayi Panchayath, Kannur District-General Civil Work
Supply, Installation, Trial Running And Commissioning Of 3600 Bph 600 Ml Carbonated Soft Drink Packing Line For Pet Bottles -general Mechanical Work
Construction Of Check Dam Cum Bridge Across Palkulam Thodu-And Allied Works Near Seminarypadi In Ward 2 Of Vazhathope Panchayat-General Civil Work