Procurement Of 12 Kv Ht Breakers For The Use Of Upper Kallar Shep.
Laying And Mounting 400 Mts 11kv Xlpe 3x300mm2 Ug Cable Using Hdd Method Including Supply Of Hdpe Pipe And Cable Marker Etc. Laying And Mounting 202 Mts 11kv Xlpe 3x300mm2 Ug Cable Using Open Trench Method Including Cable Marker Etc. Ug Cable Laying Work For Removing Cross Country Line At Kallamala Srambia To Tsunami Colony Under Electrical Section, Azhiyoor
Reconductoring With Lt Abc At Chanthoor, Thoovalloor And Varathil Under Es Kottarakkara West Under Esd Kottarakkara Reconductoring With Lt Abc At Chanthoor, Thoovalloor And Varathil Under Es Kottarakkara West
Converting St And Ss Hardware Fittings To Dt And Ds Hardware Fittings At Various Locations From 110 Kv Udumbannoor Substation To 110 Kv Pala Substation And To 110 Kv Erattupetta Substation Under Line Maintenance Section, Pala.
Re-Routing 11Kv Feeder Using Covered Conductor From Arakkal To Erappanpara Cw-4592-202526-57 Under Electrical Section Valakom Of Electrical Division Kottarakkara Re-Routing 11Kv Feeder Using Covered Conductor From Arakkal To Erappanpara Cw-4592-202526-57 Under Electrical Section Valakom Of Electrical Division Kottarakkara.
Construction Of 110Kv Substation Kuttikkol-Providing Ms Chequered Plate Over Cable Trench Inside The Control Room And Installation Of Electrical Fittings Construction Of 110Kv Substation Kuttikkol-Providing Ms Chequered Plate Over Cable Trench And Installation Of Electrical Fittings
Stringing Ht Abc From Lenin Centre To Thirumangalam Ab Work Under Electrical Section Vengad
Reconducting Of Of H T Line With Abc From Nidumpoyil Substation To24 Milekolayad Feeder Work Under Electrical Section Kolayad
Hiring One Diesel-Driven Passenger Cum Load Carrier Vehicle Having An Engine Capacity Of 1500Cc And Above, Atleast Four To Five Forward Facing Seats Bolero Camper, Tata Yodha, Tata Xenon, Force Urbania, Mahindra Xylo, Bolero, Tata Sumo Etc Hiring One Diesel-Driven Passenger Cum Load Carrier Vehicle Having An Engine Capacity Of 1500Cc And Above, Atleast Four To Five Forward Facing Seats, Not Older Than 15 Years As On The Date Of Expiry Of Contract With Driver And Fuel For Peppara Shep
Electrification Of Control Room At 110Kv Substation Viyyur In Connection With Rebuilding And Modernisation Of 110Kv Substation Viyyur- Phase 1, Including Supply Of Materials.