Engagement Of Supporting Staff In The Office Of The Assistant Commissioner Cala Shivamogga Through Placement Agency In The Project Of Widening To 4lane Paved Shoulder From Km 111.50 To 148.088 On Nh69 Old Nh 206 Honnavar - Chittoor Section In Th
Construction Of 4 Lane With Ps Idar-badoli Bypass Section From Design Km 81/300 To Km 95/500 Of Nh 168-g In The State Of Gujarat Total Length 14.200 Km On Epc Mode.
Protection Work On Upstream, Downstream And Near The Abutment Of Single Lane Mnb Span 36m Due To Cloud Burst And Flood On Local Nala In Km 71.450 Near Paligaad Market On Nh-134
Protection Work On Upstream, Downstream And Near The Abutment Of Two Lane Mjb Span 88M Due To Cloud Burst And Flood On Yamuna River In Km 64.175 Near Kisala Village On Nh-134
Protection Work On Upstream, Downstream And Near The Abutment Of Two Lane Mjb Span 88M Due To Cloud Burst And Flood On Yamuna River In Km 63.940 Near Kisala Village On Nh-134
Construction And Laying Of Boundry Pillars Along Nh- 710 Tarku-Damthang-Namchi Road 32.00 Km And Nh-710 Melli-Manpur-Namchi Road 32.015 Km In The State Of Sikkim.
Widening To 2 Lane With Paved Shoulder Of Raipur-Jassakhera Section Km 0.000 To Km 29.770 Of Nh-458 On Epc Mode In The State Of Rajasthan
Protection Work On Hill Side And Valley Side To Restore The Washout Location Due To Cloud Burst And Flash Flood In Km 802-4 Near Ojree Village On Nh-134
Protection Work On Hill Side And Valley Side To Restore The Washout Location Due To Cloud Burst And Flash Flood In Km 77 6-8 Near Silai Bend On Nh-134
Replacement Of Existing Steel Bridges At Km 6.780, Km 23.660, Km 26.935 With Prefabricated Modular Steel Bridges And Construction Of Bailey Suspension Bridge At Km 52.500 On Nh 310a.