Regular Pre-monsoon Maintenance Repairs And Other Ancillary Works At Minor Irrigation Tanks Velhala Khandala Mondhala Under Irrigation Section
Daily Maintenance And Repair Work Such As Electrical Mechanical Gate Operation Etc Allied Works Of Waghur Dam For The Period July 2025 To December 2025 And Providing Required Staff For Gate Operation Flood Controling And Electric Related Maintainance And Repair
Cr Gate Operation At Ch 12950 And 22608 For Irrigation Non Irrigation Work And Other Related Works On Hrbc Repairing Embankment Of Canal In Km 23 Of Hrbc
Maintenance And Repair To Inspection Path Of Left H R Colouring And Oiling To Both Gantry And Allied Works
Repairing Embankment Of Canal In Km 37 Of Hrbc M And R To Aqueduct At Ch 30795 And 35210 Removing The Silt And Bushy Shruby Jungal At Up Stream And Down Stream Span For Clearing The Water Way Of Hrbc
Repair To Village Road Bridge Vrb At Chainage 861m On Dhanwadi Subminor 2 And Other Ancillary Works On Main Canal Under Irrigation Section Chopda Maintenance And Repair Work On Hatnur Right Bank Canal And Repair Work To Section Office Under Irrigatio
Maintenance And Repair To Electrical Works Of Waghur Dam M And R With Colouring To Anchor Girder Bridge And Trunion Of Waghur Dam And Colouring To Control Cabin And Allied Works Of Waghur Dam
Cleaning Of Foundation Holes By Redrilling In The Gallery Of Hatnur Dam
Cleaning Of Vertical Porous Drain Pipes In The Drainage Gallery Of Hatnur Dam Using Redrilling
Repairing Of Slab Drain At Ch 40195 Of Hrbc M And R To Aqueduct At Ch 42170 And 45075 Removing The Silt And Bushy Shruby Jungal At Up Stream And Down Stream Span For Clearing The Water Way Of Hrbc