Emergent Restoration Of Sundarban Embankment Damaged Occurred On 27.07.2025 Due To New Moon Kotal Along Right Bank Of River Kalindi For A Length Of 120 M At Mouza- Samsernagar Near H O Ardhendu Mondal, G.p Kalitala Block Hingalganj Under Basirhat I Wbiw/ee/bid/e-snit-16 Of 2025-26, Sl No. - 05
Emergent Restoration Of Sundarban Embankment Damaged Due To New Moon Kotal From 22.07.2025 To 27.07.2025 Facing River Kanmari R B Near Shop Of Gobinda Barik 90.0 M Kanmari Crematorium 30.0m For A Length Of 120.00 M, Mouza Kanmari, G.p. Hat Wbiw/ee/bid/e-snit-16 Of 2025-26, Sl No. - 12
Consultancy Service For Preparation Of Detailed Project Report For Basirhat-itindaghat Road From 2.00 Kmp To 2.30 Kmp And 2.60 Kmp To 6.60 Kmp Strengthening Work In District Of North 24 Parganas. Wbpwd/bhtsd/ae/niq03e/25-26/2
Emergent Restoration Of Damaged Sundarban River Embankment During Amabasya Kotal On Dated 24.07.2025 To 27.07.2025 Alongwith Incessant Rainfall Facing River-ghatihara L B For A Total Length Of 160 M Near H O Charu Sardar, Mouza Paschim Bholakhal Wbiw/ee/bid/e-snit-16 Of 2025-26, Sl No. - 11
Emergent Repair Of Sundarban Embankment Damaged Due To New Moon Kotal During 22.07.25 To 30.07.25 Along With Incessant Rainfall Along River Dansal B At Pansighata Near Temple For A Length Of 130 Mtr. At Mouza Chalk Patli, Block Hasnabad Under Hin Wbiw/ee/bid/e-snit-16 Of 2025-26, Sl No. - 06
Emergent Restoration Of Sundarban Embankment Damaged During New Moon Kotal 24.07.2025 To 27.07.2025 Along With Incessant Rainfall From 16.07.2025 To 30.07.2025 For A Length Of 200.00 M Near Keorapara, Mouza Tushkhali, G.p. Korakati, Block Sandesh Wbiw/ee/bid/e-snit-16 Of 2025-26, Sl No. - 10
Emergent Restoration To Sundarban Embankment Damaged From 22.07.2025 To 30.07.2025 Due To New Moon Kotal Along With Incessant Rainfall Facing River Goureswar L B, Near H O Daud Gazi At Mouza Mamudpur For A Length 60.00 Metre In Block Hingalga Wbiw/ee/bid/e-snit-16 Of 2025-26, Sl No. - 01
Restoration Of Sundarban Embankment Damaged Due To Amavasya Kotal From 22-07-2025 To 27.07.2025 Facing River- Metia R B At Uchildaha Gar Ferry Ghat For A Length 100.00 M, Mouza Uchildaha, G.p. Atpukur, Block Minakhan Of Haroa Irrigation Sub Di Wbiw/ee/bid/e-snit-16 Of 2025-26, Sl No. - 14
Consultancy Service For Preparation Of Detailed Project Report For Basirhat-itindaghat Road From 2.00 Kmp To 2.30 Kmp And 2.60 Kmp To 6.60 Kmp Strengthening Work In District Of North 24 Parganas. Wbpwd/bhtsd/ae/niq03e/25-26/2
Emergent Restoration Of Sundarban Embankment Damaged Due To Amavasya Kotal From 22.07.2025 To 27.07.2025 Near Ho Susanta Das For A Length 130.00 M Facing At R B Of River Bidyadhari In G.p Hatgachi, Mouza Hatgachi, Block Sandeshkhali I Of Wbiw/ee/bid/e-snit-16 Of 2025-26, Sl No. - 13