(1) Provision Of Automatic Fire Suppression System At Major Yard Stations I.e. Guntakal Jn (gtl), Gooty Jn (gy) And Renigunta Jn (ru) And (2) Provision Of Automatic Aspiration Type Blue Led Based Aspiration System With Dual Source Optical Smoke Detection At Gooty Jn And Renigunta Jn Of Gtl Division Of S.c.railway
Guntakal Division: Provision Of 20 Passenger Lifts On The Foot Over Bridges Of Raichur, Yadgir, Dhone, Tadipatri, Pakala And Anantapur Railway Stations (lifts Portion).
South Central Railway (construction Organization) - Engineering, Procurement And Construction (epc) Contract Agreement For "proposed Double Lines With Rail Over Rail (ror) Including Signal & Telecommunication, Electrification & Electrical General Service Works Between Guntakal West And Mallappa Gate In The State Of Andhra Pradesh"
Guntakal Division: Conversion Of Jammalmadugu/ssp Into An Sp To Mitigate The Low Voltage At The Far End Of Ya/sp.
Gem Bids For Pvc Copper Cable Single Core And Multi Core Circularsheathed Cord With Flexible Conductor V2 As Per Is 694q2 .
Guntakal Division-raichur: Proposed Construction Of Staff Quarters Type-iv-2 Units (1 Unit Each For S&t And C&w) Type-iii-4 Units (1 Unit Each For S&t And C&w And 2 Units For Engg.) And Type-ii-6 Units (1 Unit Each For S&t, C&w, Elec/m And Trd And 2 Units For Engg.) In Sse/w/rc Section Under Aden/rc Sub-division - Electrical Arrangements.
Guntakal Division:- Dmm-gy, Kpd-tpty & Dmm-pak Sections: - Sw-i:- Ctr(p) - 8.341 Tkm, Trr(p) - 12.623 Tkm, Tsr(p) - 6.300 Tkm. Sw-ii:- Tfr(all)-70.004kms Sw-iii:- Ttr/ttrr-111 Sets ((fs+tws+wcmsc)- 07 Sets, (tws+wcmsc)- 22 Sets & (wcmsc)-82 Sets) Under Den/west/gtl Jurisdiction (locations As Per Annexure)
Guntakal Division: Provision Of 13 Passenger Lifts At Raichur, Yadgir And Pakala Station Buildings And On The Foot Over Bridges Of Raichur, Yadgir, Mantralayam Road, Dhone, Tadipatri, Adoni, Razampeta And Gooty Railway Stations (lifts Portion).
Guntakal Division: Sw-i- Srikalahasti:-provision Of 4 No. Of Escalators(up & Down) For 12m Fob. Sw-ii -kadapa: -provision Of 3 No. Of Escalators (up & Down) For New 12m Fob. Sw-iii -(i)anantapur: -provision Of 6 No. Of Escalators (up & Down) For New 12m Fob.(ii) Provision Of 3 No. Of Lifts To Existing Fob.
K Guntakal Division: Dmm-gy & Dmm-pak Sections: Proposed Cess Repair/widening Work For Making Up Of Cess In Aden/atp & Aden/mpl Sub-divisions Under Den/west Jurisdiction. (locations As Per Annexure)