Rehabilitation And Modernization Of Western Kosi Main Canal From Km 18.29 To Km 26.21 India Portion Of Western Kosi Irrigation Scheme Under Bihar Water Security And Irrigation Modernization Project Bwsimp
Rehabilitation And Modernization Of Western Kosi Main Canal From Km. 0.00 To Km. 18.29 India Portion Of Western Kosi Irrigation Scheme Under Bihar Water Security And Irrigation Modernization Project Bwsimp
Construction Of 53 No. 125 Mm X 40 Mm X 61m Deep Tube Well With I.m.-ll Hand Pump With Platform And Drain And Construction Of Soak Pit Of 1.0 M Diameter And 2.0 M Deep With Dry Brick Honey Comb Shaft With Bricks Of Class Designation 100b Etc... In Summer And Heat Situation And In Place Of Water Table Depletion For The Year 2025-26
Design, Construction, Supply, Testing And Commissioning Of Piped Water Supply Schemesunder "har Ghar Nal Ka Jal" Nischay Yojna In 12 (twelve) Incomplete Wards In Prd Panchayat With Electric Driven Pumps In The District Of Madhubani, Bihar On Turn-key Basis With 3 Months Trial Run Period Under Mukhyamantri Grameen Peyjal Nishchay Yojna (non Quality Affected) Under P.h. Division
Construction Of G+1 Divisional & Sub-divisional Building With Sub-division At Ground Floor And Division On First Floor At Existing Divisional Campus At P.h.division
Supply And Installation Of 10 Nos 12 Watt Solar Street Light And 237 Nos Solar High Mast Light In Parliamentary Constituency
Construction Of Bhandari Pokhar, Singh Tola Pokhar, Naina Mishr Pokhar, & Kejriwal Pokhar Ghat And Beautification Of It's Buffer Area In Nagar Parishad
Construction Of Deorhi Pokhar & Radha Krishan Pokhar Ghat And Beautification Of It's Buffer Area In Nagar Parishad
Work Of Reviving Old Kamaladhar Jeevach River, Old Kamla River Etc And Increasing Irrigation Facilities And Flood Reduction Work
Construction Work Of 1.158Km Of Belha Small Canal, 0.009 Km And 0.182 Km Of Small Canal, 0.487Km Jagatpur Small Canal, 0.487 Km Khadgama Small Canal, 1.37M Cd Work