Provision Of Ballast Less Tracks At Binnaguri, New Mal Jn, Hasimara And Dalgaon Railway Stations Of N. F. Railway Total Length 6.301 Km
Assessment Of The Strength Of The Pier & Abutment Of 17 Nos. Bridges Under Sse/br/njp With Rdso Standard Of 25t Loading-2008 Standard
Manufacture, Supply & Fabrication Of 6x20.4m & 6x26.80m Service Girder And 10000 Nos. C.c. Cribs Under Dy.ce/br-line/maligaon.
Fabrication, Supply & Replacement Of Open Web Steel Bridge Girder Of Span Of Br No.179 Dn 5x45.7m At Km161/2-4, 196dn 5x45.7m At Km 169/7-0, 270 Dn Span 3x45.7m At Km. 221/5-6 On The Section Noq-dtx Under Sse/br/bngn And Bridge Number 521span 2x6.1+4x30.5m; 59dn Span 2x30.5+1x24.4m; 91dn Span 3x30.5m, 92dn Span 2x30.5m And 63 2x18.3m By 25t Loading Under Sse/br/pno And Replacement Of Steel Girder Of 52 Nos.12.2m Span Of Bridge Nos 1983x12.2, 1993x12.2, 14x12.2m, 133x12.2, 371x12.2m, 551x12.2, 571x12.2m, 621x12.2, 882x12.2, 1934x12.2m, 141x12.2, 383x12.2m, 124x12.2, 175x12.2, 193x12.2m, 206x12.2 & 217x12.2 By Psc Slab Under Sse/br/njp.
Supply Of Screen Floor Set Including U-clamp Bolt Complete With Double Square Nut & Spacer For Bcm And Sbcm Machines Pt. No-64.09.5000.103, Make: Plasser Or Its Equivalent. As Per Annexure Attached. Material Specification Iso2062-2011 With Amendment No. 01-2012, Gr. E250a, Mild Steel. Warranty: 30 Kms Of Working From The Date Of Installation Or Two Years Whichever Is Earlier..
Supply Of Tungsten Carbide Tamping Tool For Pct Machines, Make-crcc Or Equivalent, 1 Set Consisting 16 Tools 8+8, As Per Drawing:- 1. Drawing No. - Rdso/tm/01a/16rev- 1, Crcc Part No.- 80264411938 Inner Side Fitted Tamping Tool 8 Nos. 2. Drawing No. -tmd/jhs/tm/pctm/01, Crcc Part No.- 80264411108 Outer Side Fitted Tamping Tool 8 Nos..
Portable Train Detection And Alarm System In Identified Bridges Of N.f.railway Under Dy. Ce/br-line/maligaon.
Conducting Final Location Survey Fls For I New Bg Railway Line Projects 900.00km & Ii Gauge Conversion / Doubling / Third Line / 3rd & 4th Line 600.00km Of Various Projects In India, Nepal And Bangladesh With Geo-technical Investigation, Preparing Eirr, Epc Document & Submission Of Dpr Etc. As Per Railway Boards Latest Guide Lines Complete In All Respect.
Up-keeping Of One No. Passenger Elevator At Nilachal Rest House/con/n.f.rly. At Maligaon For The Period Of Three 3 Years. Say 1095 Days.
3-d Scanning Of River Bed In Identified Bridges Of N.f.railway Under Dy.ce/br- Line/maligaon.