Supply Of Muffle Furnace For Coal Lab /chemical Div/btps
Supply Of Pressure Gauges For Use In Main Boiler Area For Unit-1 And 2 Required For Stage-i/btps
Ceps, Ccwps Overhaul And Fabrication, Welding Of Column Pipes For Ccwps
Removal Of Spilled Over Coal And Fine Dust At Crusher House Floors By Head Loads On To Running Conveyor Required In Mm/chp/btps From 01.08.2025 Or Actual Date Of Commencement Of Work To 30.11.2025
Removal Of Spilled Over Coal, Fine Dust And Wet Coal At Apron Feeder Floor And Bcn - 2ab Tunnel Including Fg Floors By Head Loads On To Running Conveyor Required In Mm/chp/btps From 01.08.2025 Or Actual Date Of Commencement Of Work To 30.11.2025
Procurement Of Tyre Mounting Cream 1000 Kgs Required For Tyre Section At Base Workshop, Pkoc Manuguru Area - Reg.
Removal Of Spilled Over Coal, Fine Dust And Wet Coal At Tail End, Head End Along The Bcn-4a/b, 5a/b, Bcn-10, Tp-3, Tp-4, 6a/b Tail End And Erh Area By Head Loads On To Running Conveyor From 01.08.2025 Or Actual Date Of Commencement Of Work To 30.11.2025
Fabrication And Erection Works To Modify/ Repair Of Two Idle Bunkers At Kpug Mine, Manuguru Area On Tonnage Basis For A Period Of 2 Yaers - Reg.
Supply Of Muffle Furnace For Coal Lab /chemical Div/btps
Supply Of Bearings For Crusher At Mm-ii/chp/ Btps