Supply Of Smoke Detector, Heat Detector, Brake Module And Main Control Unit As Per Tender Description..
Nanded Division - Sw-i - Sse/pway/whm Jurisdiction: Proposed Safety Related Yard Improvement & Upgradation Works At Various Yards ( Bsq,lhd,amw,juk,kxx,whm,kkg & Knrg Yards) (irpsm Project Id : 11.04.31.25.3.53.003) Sw-ii - Sse/pway/akot Jurisdiction: Proposed Safety Related Yard Improvement & Upgradation Works At Various Yards ( Svw & Ak Yards) (irpsm Project Id : 11.04.31.25.3.53.007.
Supply of Dc Mcb 2A, Double Pole, Type-C, Min 110V Dc, Breaking Capacity-6/10 Ka Conforming To Is/Iec: 60947, Part-2Latest For Lhb Ac Coaches.
Sw-i- Nanded Division - Sse/p.way/j Jurisdiction: Proposed Safety Relates Yard Improvement & Upgradation Of Works At Various Yards (irpsm Project Id : 11.04.31.25.3.53.011) & Sw-ii-nanded Division - Sse/p.way/selu Jurisdiction: Proposed Safety Relates Yard Improvement & Upgradation Of Works At Various Yards (irpsm Project Id : 11.04.31.25.3.53.002)
Supply Of Silicon Sealant Black, Make/model-teroson 8590 Or Sika 264t Or Total Seal 100 Or 3m 8509 Or A Technically Equivalent Polyurethane Adhesive/sealant Specifically Approved For Direct Glazing And Structural Bonding Of Window Glass In Rolling Stock For Vande Bharat Train. Packaging Should Be In 600ml Of Container And Shelf Life Should Be Minimum 12 Months From Date Of Supply..
Scr Construction Organisation: Nanded Division. Akola-khandwa Section-gauge Conversion Of Track From Mg To Bg Between Akola - Akot Stations- Execution Of Balance Works For "laying And Linking Of Bg Track, Leading Of P-way Materials, Ballast Leading And Dumping Etc., And Connected Works For Yard Remodelling At Akola Junction In Nanded Division Of South Central Railway.
Supply Of Class 4 Hand Gloves With 36 Kv Working Voltage As Per Is 13774:2021 Rev-2 Without Joint For Electrical Work Usage, Proof Test Voltage: 40kv: Withstand Voltage: 50kv Desirable: A Certificate That Material Has Been Purchased From The Oem/authorized Dealer Of Oem Along Guarantee/warranty Certificate And Test Certificate With Batch No. & Each Gloves Serial No. From Prescribed Institute To Be Submitted At The Time Of Supply..
Ned Div: Mmr-mue Section: Supply And Stacking Of 50 Mm Gauge Hard And Durable Machine Crushed Stone Ballast At Parbhani (pbn)ballast Depot And Loading The Same Into Hopper/traffic Ballast Wagon By Mechanical Means Under Aden/pau's Jurisdiction For Completion Period Twelve (12) Months( Including (03)three Months Mobilization Period).
Sw-i- Nanded Division: Mmr-awb Section (srden/w/ned)provision Of Safety Fencing / Boundary Wall Of Along The Track For Speed 130kmph And Above Using Nhai Anti-crash Barrier / W-beam Steel Fencing For 115 Km Fencing Length (phase-i) (irpsm Id 11.04.16.24.3.53.002 Fy 2024-25)( Balance Works- Drain Works Only)sw-ii- Nanded Division: Awb-j Section (srden/w/ned): Provision Of Safety Fencing / Boundary Wall Of Along The Track For Speed 130kmph And Above Using Nhai Anti-crash Barrier / W-beam Steel Fencing For 85 Km Fencing Length (phase-i) ((irpsm Id 11.04.16.24.3.53.001 Fy 2024-25) (balance Works- Drain Works Only)sw-iii-nanded Division: Mmr-j Section(sr.den/w/ned) Provision Of Safety Fencing Along The Track For Speed 130kmph And Above Using Nhai Anti-crash Barrier / W-beam Steel Fencing For 64.58 Km Fencing Length(phase-ii).(irpsm Id 11.04.16.24 .3.53.004 Fy 2024-25) (balance Works- Drain Works Only)
Ned Div: Mmr-mue Section: Supply And Stacking Of 50 Mm Gauge Hard And Durable Machine Crushed Stone Ballast At Pingli(piz)ballast Depot And Loading The Same Into Hopper/traffic Ballast Wagon By Mechanical Means Under Aden/pau's Jurisdiction For Completion Period Twenty Four(24) Months) Including (03)three Months Mobilization Period).