Gem Bids For Repair, Repair Oblice Maintenance Of Ewbb Roller Plain 10 Nosroller Rocking 09 Nos And Jack Hydraluic 15 Ton 10 Nos Atge Ep Jodhpur, Taking Out To Contractor Work Shop Forrepair Oblice Maintenance And Brought Back To Ge Ep, Repair Oblice Maintenance Removing Old Loose Paint Rollerplain 10 Nos And Roller Rocking 09 Nos As Per Rate Analysiss No 2, Repair Oblice Maintenance Jack Hydraulic 15 Ton10 Nos As Per Rate Analysis S No 3, Dismantilling And Reassembling Jack Hydraulic, Complete Oiling And Greasingjack Hydraulic, Dismantilling And Re Assembling Roller Plainand Roller Rocking, S And F En Series Steel Bush As Persample, S And F Pin Cotter 25 Mm Long As Per Sample, Sand F Pin Cotter 50 Mm Long As Per Sample, S And F Specialsliding Pin 63 Mm Cir As Per Sample, S And F Grease Fillinglid As Per Sample, S And F En Series Steel Shaft As Persample, S And F Mild Steel Handle As Per Sample, S And Fnut Bolt Washer And Spring Washer As Required, S And Fspecial Roller As Per Sample, S And F Side Oblice Middlemain Bush Plate As Per Sample, Applying Grease To Eachbush And Shaft 0 Point 25 Kg Per 450 Per Kg 112 Point 50, Main Body Alignment Center Lining Measuring And Adjustingangles Etc On Special Cnc Machine, Roller Alignment Centerlining Measuring And Adjusting Angles Etc On Special Cncmachine, Re Threading Oblice Strengthening Old Threads, Re Welding Broken Welds And Strengthen Welding Afterproper Grinding Oblice Cleaning, Requirement Of Red Oxidemetal Primer, Requirement Of Steel Wire Brush, Requirement Of Cotton Waste, Requirement Of Turpentineoil Oblice Thinner, Requirement Of Olive Green Metal Paint, Applying 03 Coats Of Paint, Numbering And Naming Of Partwith White Metal Paint
For more details Kindly fill up the form and our executive will get in touch with you or Call us :- 916351913337 .