The Work Involves Conducting Mock-up Tests At Both The Building Dock And Repair Dock In Csl. Additionally, The Work Includes The Excavation Of Anodes And, If Necessary, The Design Of A New Iccp System Based On The Mock-up Test Results. Conducting Of Mock Up Test Of Iccp System At Building And Repair Docks In Csl
For more details Kindly fill up the form and our executive will get in touch with you or Call us :- 916351913337 .