Sub Head - Protection Of Sukad Khad Bridge Abutment At Km. 2/445 Dohag Side 2Nd Part Restoration Of Rain Damages On Dhelu Chowki Chauntra Road Km. 0/0 To 10/0
Diamond Core Bit Drilling, Flushing And Consolidation Grouting The Concrete With Cement On Right Side Downstream Abutment Of Spillway At Its Junction With Right Earth Dam Of Palemvagu Project, Venkatapuramm, Mulugu D.
Supply of Abutment Ring As Per Clw Drawing.
Supply Of Abutment Ring.
Construction Of Wing Wall On Abutment A2 (ir Side) At Dfcc Rfo Bridge No. 108 Between Rajpura-shambhu Station In The Unit Of Cgm/dfccil/ambala.
Separation Of Face Wall Of Abutment Of Bridge No.969/1, Amla-nagpur Section And Bulging Of Pier No.p2 And P3.
(i) Udn-usd Section- Raising Of Approach Walls, Roads, Earthworks, Grouting, Etc. To Avoid Seepage, Runoff Water & Waterlogging On Various Rub Under Aden-vya Section. (ii) Udn-usd Section Strengthening Of Toe Wall, Return Wall, Ballast Wall, Slab, Pier Abutment Etc. Of Major Bridge No 17, 52a, 26, 60, 63 & 70.
Construction Of Abutment Wall 15 No Smc Works In Naraingarh Range Shehzadpur Block Labour Amount
Supervision And Quality Assurance Work During Execution Of Re Walls And Re Abutments Using Japanese Rrr Technology At Sewagram Ror.
Strengthening Of Br. No. 322-a (1x12.20+2x18.30+1x12.20 M Plate Girder Bridge) Km 283/11-15 By Jacketing Of All Piers And Abutments, With Other Protection And Ancillary Works On Umb - Ldh Section.